[E4] Tohoku Expressway Out-bound, Yahaba PA/SIC
Nighttime closure notice
October 1st (Tue) to 10th (Thu) from 8pm to 6am each day
~ Pavement repair work will be carried out ~
- Corporate Top
- Press Room
- Press Release Tohoku office
- [E4] Notice of nighttime closure of Yahaba PA/SIC Tohoku Expressway Out-bound
The latest regulatory information isDraTraPlease see.
September 3, 2024
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Morioka Management Office
At NEXCO EAST Morioka Management Office (Morioka City, Iwate Prefecture), E4 A night-time closure will be implemented at the Yahaba Parking Area (hereinafter referred to as "PA") and Yahaba Smart Interchange (hereinafter referred to as "SIC") on Tohoku Expressway Out-bound (hereinafter referred to as "Tohoku Expressway Expressway") to repair damaged pavement.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when heading out.
1. Closed location and date and time
- Closures:
Tohoku Expressway Out-bound Line Yahaba PA, Yahaba SIC - Attached to each line E4 The indications such as indicate the route number (numbering) of Expressway.
- Date and timeImplementation date:October 1st (Tuesday) to October 10th (Thursday) 2024Every day from 20:00 to 6:00 the next morning (excluding Saturdays, Sundays, and holidays)Preparation day:令和6年10月11日(金)~17日(木)Every day from 20:00 to 6:00 the next morning (excluding Saturdays, Sundays, and holidays)
- In stormy weather, it will be postponed to the spare day.
- The decision to proceed with construction will be announced on X (formerly Twitter), etc.
Usage Guide
2. Detours and nearby rest facilities
迂回や休憩施設のご利用にあたっては、別紙-1【PDF:109KB】別紙-2【PDF:145KB】をご参照ください。
特定の休憩施設にご利用が集中しますと、駐車マスの不足が考えられます。お時間にゆとりをもってお出かけいただくとともに、分散して休憩施設をご利用いただくようお願いいたします。
3. Construction overview
Tohoku Expressway Out-bound The repair work will be carried out on the entrance and exit ramps of the Yahaki PA on the Route 2, 3, and 4 lines due to pavement damage. Since the section to be repaired is a single lane, it is necessary to close the ramp for the work since the work cannot be carried out with the normal lane restrictions.
Therefore, in order to minimize inconvenience to customers, the ramp will be closed during the nighttime on weekdays when traffic volume is low, so that the work can be carried out in an intensive and efficient manner. We ask for your understanding and cooperation as this work is necessary for the safe and comfortable use of Expressway.
Four. How to obtain traffic information
(1) Guidance by distribution / posting
- Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
(2) Road traffic information that can be obtained before going out
- NEXCO東日本お客さまセンター(24時間オペレーターが対応)
ナビダイヤル:0570-024-024
または:03-5308-2424 - NEXCO EAST Expressway Traffic Information Site "DraTra"Real-time informationConstruction regulation information
- 日本道路交通情報センター(JARTIC) 道路交通情報
全国共通ダイヤル 050-3369-6666
(携帯電話短縮ダイヤル #8011)
※全国どこからでも最寄りの情報センターに接続します。
岩手情報 050-3369-6603
東北地方高速情報 050-3369-6761
【アドレス】https://www.jartic.or.jp/ - LINE official account "NEXCO EAST"We inform you about the traffic closure situation in NEXCO EAST jurisdiction.
[Search] Search by "NEXCO EAST"
[ID] @e-nexco
(3) Road traffic information available while using the Expressway
- Road information board
- Highway radio (AM1620kHz)
The highway radio section is indicated by signs on the Expressway. - Highway Information Terminal
We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA. - VICS
You can get road traffic information with VICS-compatible car navigation and other on-board devices.
- Information is also distributed through the official X (formerly Twitter) account."NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.