[E46] Akita Expressway Up/Down Line Kitakami JCT ~ Yuda IC
Nighttime road closure notice

September 17th (Tuesday) to October 7th (Monday) from 8pm to 6am the following morning
~We will carry out renovation work on road information board equipment~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E46] Notice of nighttime road closure on Akita Expressway inbound and outbound lanes, between Kitakami JCT and Yuda IC

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 695KB]

August 19 2024
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Kitakami Management Office

NEXCO EAST Kitakami Management Office (Kitakami City, Iwate Prefecture) will close the E46 Akita Expressway (hereinafter referred to as "Akita Expressway") between Kitakami Junction (hereinafter referred to as "JCT") ~ Yuda Interchange (hereinafter referred to as "IC") at night in order to carry out renewal work of variable road information board equipment.
We apologize for any inconvenience this may cause, but we ask for your understanding and cooperation so that you have plenty of time when you go out.

1. Closed section

[1] Akita Expressway, northbound and southbound lanes, Kitakami JCT to Yuda IC
[2] Akita Expressway, northbound and southbound lanes, Kitakami-Nishi IC to Yuda IC

(Location map)

Image of (position map)

2. Date and time

【1】秋田道 上下線 北上JCT~湯田IC

令和6年9月17日(火)~9月18日(水)
Every day from 20:00 to 6:00 the next morning

【2】秋田道 上下線 北上西IC~湯田IC

令和6年9月19日(木)~10月7日(月)
Every day from 20:00 to 6:00 the next morning
Preparation day:
令和6年10月8日(火)~10月11日(金)
Every day from 20:00 to 6:00 the next morning
Image of date and time
Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

3. 3. Construction details

Akita Expressway Upper and Lower Lines Kitakami JCT ~ Yuda IC Between the two ICs, we will carry out renewal work on the aging information board. In order to minimize inconvenience to our customers, we will close the road at night on weekdays when traffic is low, and carry out construction intensively and efficiently. This is necessary for the safe and comfortable use of Expressway, so we ask for your understanding and cooperation.

Photo before construction
Before construction
Photo after construction (image)
After construction (image)

Four. Detour

For detours, please refer to Attachment 1-1 [PDF: 200KB] and Attachment 1-2 [PDF: 198KB].
The detour will increase travel time, so please allow yourself plenty of time when traveling.

Five. Regarding transit fare adjustment due to suspension of traffic

For customers who exit Expressway due to a nighttime road closure and then detour around the closed section to re-enter in the same direction, a "transfer adjustment" will be made to adjust the toll fee according to the section used. (Appendix 2 [PDF: 270KB])

How to use transit fare adjustment

ETC customers

  • For customers using ETC, please drive wirelessly at designated outflow ICs, and also wirelessly drive at re-inflow ICs. (Transfer certificates are not issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.

Customers such as cash

  • Customers paying by cash or other means should collect a "Transfer Certificate" at the designated IC where they leave, collect a pass at the designated IC where they re-enter, and then hand over the "Transfer Certificate" and pass at the toll gate where they first pay the toll.

Precautions regarding transit fare adjustment

  • After the road closure is lifted, transfer fares will be adjusted even if you enter from a designated exit interchange.
  • If there is an outflow at the IC in the road closure section, or if it is re-inflow after the road closure is lifted, the transfer fare will be adjusted.
  • Only vehicles with ETC equipment can use the Oshu Smart IC, Hanamaki PA Smart IC, and Yokote Kita Smart IC.

6. How to obtain traffic information

(1) Guidance by distribution / posting

  • We will post posters and leaflets at toll booths and rest facilities in the surrounding area.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official X (formerly Twitter) account.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.