[E7] Akita Expressway Up and Down Line Akita Kita IC - Noshiro Minami IC
Notice of nighttime traffic closure and one-way alternating traffic regulation

May 8th (Mon) - June 28th (Wed)
~Pavement Repair Work, etc.~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E7] Akita Expressway Up and Down Line Akita Kita IC - Noshiro Minami IC Notice of nighttime traffic closure and one-way alternate traffic regulation

The latest regulatory information isDraTraPlease see.

PDF version 【PDF: 282KB】

April 20, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Akita Management Office

NEXCO EAST The Akita Management Office (Akita City, Akita Prefecture) will close the E7 Akita Expressway (hereinafter referred to as "Akita Road") from the Akita Kita Interchange (hereinafter referred to as "IC") to the Noshiro Minami IC on the upper and lower lines during the night and restrict one-way alternating traffic (waiting time of about 15 minutes) due to pavement repair work and other reasons.
We apologize for any inconvenience this may cause and ask for your understanding and cooperation in allowing extra time for your trip.

1. Regulation section and date and time

  1. Regulation section
    ①Night traffic closure:
    [1] Akita Expressway Up and Down Line Akita Kita IC - Showa Ogahanto IC
    [2] Akita Expressway Up and Down Line Gojome Hachirogata IC - Hachiryu IC
    [3] Akita Expressway Up and Down Line Gojome Hachirogata IC - Kotooka Moritake IC
    [4] Akita Expressway Up and Down Hachiryu IC - Noshiro Minami IC
    (2) Regulations for alternate traffic on one side:
    [5] Akita Expressway Up and Down Line Akita Kita IC - Showa Ogahanto IC
    [6] Akita Expressway Up and Down Line Gojome Hachirogata IC - Kotooka Moritake IC
    [7] Akita Expressway Up and Down Line Kotooka Moritake IC - Hachiryu IC
  2. Image of restricted section
    • The E7 display attached to the route indicates the route number (numbering) of Expressway, etc.
  3. date and time
    ①Night traffic closure
    Implementation date
    • [1] Akita Expressway Upper and Lower Lines Akita Kita IC - Showa Ogahanto IC
      • May 8th (Mon) to 10th (Wed), 2023
      • May 15th (Monday) to 17th (Wednesday), 2023 From 20:00 to 6:00 the next morning [6 nights]
    • [2] Akita Expressway Up and Down Line Gojome Hachirogata IC - Hachiryu IC
      • Monday, May 22, 2023 to Friday, June 16, 2020 20:00 to 6:00 the next day [20 nights]
    • [3] Akita Expressway Up and Down Line Gojome Hachirogata IC - Kotooka Moritake IC
      • June 19th (Monday) to 23rd (Friday), 2023 From 20:00 to 6:00 the next morning [5 nights]
    • [4] Akita Expressway Hachiryu IC - Noshiro Minami IC
      • June 26th (Monday) to 28th (Wednesday), 2023 From 20:00 to 6:00 the next morning [3 nights]
    Preparation day
    • May 11th (Thursday), 12th (Friday), 18th (Thursday), 19th (Friday), 5th year of Reiwa
    • June 29th (Thursday) to July 28th (Friday), 2020 Every day from 20:00 to 6:00 the next morning
    ②Alternate traffic regulation on one side
    Implementation date
    • [5] Akita Expressway Up and Down Line Akita Kita IC - Showa Ogahanto IC
      • May 8th (Mon) to 10th (Wed), 2023
      • May 15th (Monday) to 17th (Wednesday), 2023 6:00 am to 8:00 pm [6 days]
    • [6] Akita Expressway Up and Down Line Gojome Hachirogata IC - Kotooka Moritake IC
      • Monday, May 22nd to Friday, June 2nd, 2023 6:00 am to 8:00 pm [10 days]
    • [7] Akita Expressway Up and Down Line Kotooka Moritake IC - Hachiryu IC
      • June 6 (Tue) to 9 (Fri), 2023
      • June 13 (Tuesday) to 16 (Friday), 2023 6:00 a.m. to 8:00 p.m. [8 days]
    Preparation day
    • May 11th (Thursday), 12th (Friday), 18th (Thursday), 19th (Friday), 5th year of Reiwa
    • From Monday, July 3, 2023 to Friday, July 14, 6:00 a.m. to 8:00 p.m. each day
Date and time image image 1
Date and time image image 2

【Usage Guide】

Image of [Legend]
Two-dimensional code image link to NEXCO EAST (TOHOKU) twitter (external link)
  • The service areas (hereinafter referred to as "SA") in the closed section will be closed as follows.
    Akita Expressway Up and Down Hachiroko Service Area 20:00 - 6:00 the next morning
  • In stormy weather, it will be postponed to the spare day.
  • Construction implementation decisions will be announced on Twitter, etc.

2. Detour

Please refer to [Attachment 1] to [Attachment 4] [PDF: 869KB] for detours.
Due to the detour, the required time will be longer, so please leave with plenty of time.

3. Regarding transit adjustments due to suspension of traffic

For customers who temporarily flow out of Expressway due to road closures, detour around the road closure section, re-enter and transfer in the forward direction, we will implement "connection adjustment" to adjust the toll according to the section used. increase. (Refer to [Attachment 5] [PDF: 126KB])

How to use transit adjustment

ETC customers

  • Customers using ETC are requested to run the outflow designated IC wirelessly and the re-inflow designated IC wirelessly. (No transit certificate will be issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.
  • Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.

Customers such as cash

  • Customers who pay by cash, etc. should receive the "passage certificate" at the outflow designated IC, and then get the "passport" at the re-inflow designated IC, and then make the "transfer" at the toll booth that pays the fare first. Please give us your "certificate" and "passport".

Common to ETC and cash customers

  • If the suspension of traffic is released after the outflow designated IC is released, the fare will be adjusted even if it is re-introduced from the IC (including the outflow designated IC) in the closed road section in the forward direction.

Four. Construction overview

Akita Road Upper and Lower Line Between Akita Kita IC ~ Noshiro Minami IC, pavement repair work will be carried out due to damage to the road surface. In order to minimize inconvenience to customers, we will restrict one-sided alternating traffic during the day and close the road at night on weekdays when there is little traffic, and carry out construction work intensively and efficiently. This construction is necessary for safe and comfortable use of the Expressway, so we ask for your understanding and cooperation.

photo of pavement damage photo
Pavement damage pictures
Pavement repair work Photo of the work situation
Pavement repair work Work progress photo

Five. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.