[E4A] Aomori Expressway between Aomori JCT and Aomori Higashi IC (upper and lower lines)
Implementation of nighttime closure

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E4A] Aomori Expressway Aomori JCT-Aomori Higashi IC (upper and lower lines) Nighttime closure

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 784KB]

August 29, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Aomori Management Office

NEXCO EAST Aomori Management Office (Aomori City, Aomori Prefecture) paves from E4A Aomori Expressway Aomori Junction (JCT) to Aomori Higashi Interchange (IC) in a temporary 2-lane section (one lane on one side) Due to repair work, etc., the road will be closed at night as follows.
Therefore, when leaving, please leave with plenty of time and take a detour to National Route 7, etc. when driving.
We apologize for the inconvenience caused to customers using the Expressway, but we ask for your understanding and cooperation in the construction necessary for safe and comfortable use of the Expressway.

1. Closed section

Aomori Expressway Aomori JCT and Aomori Higashi IC (upper and lower lines)

(Location map)

Image of position map

2. Closed date and time

Aomori Expressway between Aomori JCT and Aomori Higashi IC (upper and lower lines)
September 26 (Mon) to 30 (Fri), 2022
Every night from 19:00 to 6:00 [5 nights]
[Reserve date: October 3rd (Monday) to 7th (Friday)]

  • The night closure will be from 19:00 on weekdays to 6:00 the next morning.
    (Friday night work will be done until 6 am on Saturday)
  • It may be canceled depending on the weather, so please check the latest information from websites such as "DraTra" when using the Expressway.
Image of closed days

【Usage Guide】

Image of [Legend]

3. Detour

 国道7号、国道4号、青森市道、県道44号、県道47号(別添資料【PDF:220KB】

Four. Construction content

Pavement repair work
We will carry out repairs, etc. for areas where cracks, etc., on the pavement surface are conspicuous.

Photo before construction
Before construction
Photo after construction (image)
After construction (image)

Five. How to obtain traffic information

  • Official Twitter account "NEXCO EAST (Tohoku)" ( @e_nexco_tohoku ) Also delivers information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.