[E4] Tohoku Expressway Shiroishi IC Night lamp closure

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 483KB]

May 11, 4th year of Reiwa
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Sendai management office

NEXCO EAST Sendai Management Office (Aoba-ku, Sendai City) will be closed at night at the E4 Tohoku Expressway Shiroishi Interchange (IC) for pavement repair work as follows.
Therefore, when you go out, please leave with plenty of time, and when you drive, please detour to Route 4.
We apologize for the inconvenience caused to customers who use the Expressway, but we ask for your understanding and cooperation in the construction work necessary to use the Expressway safely and comfortably.

1. Closed place

[1] Tohoku Expressway Shiroishi IC exit ramp
[2] Tohoku Expressway Shiroishi IC entrance ramp

(Location map)
Image of (position map)

2. Closing date and time

  • [1] Tohoku Expressway Shiroishi IC exit ramp
    • May 23rd (Monday) -27th (Friday), 4th year of Reiwa
      Every night from 20:00 to 6:00 the next day [5 nights]
    • [Preliminary day: May 30th (Monday) -June 3rd (Friday)]
    • You can get off the Shiroishi IC on the last day of construction, but you cannot go to Sendai on Route 4.
  • [2] Tohoku Expressway Shiroishi IC entrance ramp
    • June 6th (Monday) to 8th (Wednesday), 4th year of Reiwa
      Every night from 20:00 to 6:00 the next day [3 nights]
    • [Preliminary days: June 9th (Thursday) to 10th (Friday), 13th (Monday)]
  • Closing at night is from 20:00 on weekdays to 6am the next morning.
    (Friday night construction will be done until 6 am on Saturday)
  • It may be canceled depending on the weather, so please check the latest information from websites such as "DraTra" when using the Expressway.
Image of closing date
  • You can get off the Shiroishi IC on the last day of construction, but you cannot go to Sendai on Route 4.

3. Detour

Attachment [PDF: 344KB]

  1. Between Kunimi IC and Shiroishi IC
    National highway No. 4, prefectural highway No. 46
  2. Between Shiraishi and Murata IC
    National highway No. 4, prefectural highway No. 14

Four. Construction content

Pavement repair work

We will repair the pavement of the Shiroishi IC lamp section.

Photo before construction
Before construction
Photo after construction (image)
After construction (image)

Five. How to obtain traffic information

  • DraPla", a site full of useful information on Expressway nationwide
    【address】
    PC version (https://www.driveplaza.com/)
    Mobile version (http://m.driveplaza.com/)
    Smartphone version (http://www.driveplaza.com/smp/)
  • Expressway traffic information service "Drive Traffic (DraTra)"
    (https://www.drivetraffic.jp/construction-regulation)
    It provides real-time road traffic information and traffic congestion prediction.
    【address】
    PC version (https://www.drivetraffic.jp/)
    Mobile version (http://m.drivetraffic.jp/)
    Smartphone version (http://www.drivetraffic.jp/smp/)
  • NEXCO東日本お客さまセンター
    24時間365日オペレーターが応対いたします。
    【電話番号】
    0570-024-024 または 03-5308-2424
  • 日本道路交通情報センター(JARTIC)
    【電話番号】
    全国共通ダイヤル 050-3369-6666 (携帯短縮ダイヤル #8011
    ※全国どこからでも最寄りの情報センターに接続します。
    仙台センター 050-3369-6604
    東北地方高速情報 050-3369-6761
  • Highway radio
    Highway radio (AM1620kHz)
    The section that is broadcasting is indicated by the sign on Expressway.
  • Official Twitter account "NEXCO EAST (Tohoku)" ( @e_nexco_tohoku ) Also delivers information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.