[E7] Akita Expressway between Akita Kita IC and Kotooka Moridake IC (upper and lower lines)
Implementation of nighttime traffic closure and one-sided alternate traffic regulation

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E7] Akita Expressway Akita Kita IC-Kotooka Moridake IC (upper and lower lines) Nighttime traffic closure and one-sided alternate traffic regulation

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 483KB]

April 25, 4th year of Reiwa
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Akita management office

NEXCO EAST Akita Management Office (Akita City, Akita Prefecture) is located on the E7 Akita Expressway Akita Kita Interchange (IC) in the provisional two-lane section (one lane on each side) to Kotooka Moridake IC. For pavement repair work, etc., we will implement nighttime traffic closure and one-sided alternate traffic regulation (waiting time of about 15 minutes) as follows.
Therefore, when you go out, please leave with plenty of time, and when you drive, please detour to National Highway No. 7.
We apologize for the inconvenience caused to customers who use the Expressway, but we ask for your understanding and cooperation in the construction work necessary to use the Expressway safely and comfortably.

1. Closed section

[1] Akita Expressway Akita Kita IC-Gojome Hachirogata IC (upper and lower lines)
[2] Akita Expressway Showa-Ogahanto IC-Gojome Hachirogata IC (upper and lower lines)
[3] Akita Expressway Showa-Ogahanshima IC-Kotooka Moridake IC (upper and lower lines)

2. One-sided alternating traffic regulation section

[4] Between Akita Kita IC and Showa-Ogahanjima IC on the Akita Expressway (upper and lower lines)
[5] Akita Expressway Showa-Ogahanshima IC-Gojome Hachirogata IC (upper and lower lines)

(Location map)
Image of (position map)

3. 3. Date and time of each traffic regulation

Night traffic

  • [1] Between Akita Kita IC and Gojome Hachirogata IC (upper and lower lines)
    • May 9th (Monday) to 20th (Friday), 4th year of Reiwa
      Every night from 20:00 to 6:00 the next day [10 nights]
  • [2] Showa Oga Peninsula IC-Gojome Hachirogata IC (upper and lower lines)
    • May 23rd (Monday) -June 10th (Friday), 4th year of Reiwa
      Every night from 20:00 to 6:00 the next day [15 nights]
  • [3] Showa Oga Peninsula IC-Kotooka Moridake IC (upper and lower lines)
    • June 13th (Monday) to 17th (Friday), 4th year of Reiwa
      Every night from 20:00 to 6:00 the next day [5 nights]
  • The night traffic will be closed from 20:00 on weekdays to 6:00 the next day.
    (Friday night work will be done until 6 am on Saturday)

Alternate traffic regulation on one side

  • [4] Between Akita Kita IC and Showa-Ogahanjima IC (upper and lower lines)
    • May 9th (Monday) to 20th (Friday), 4th year of Reiwa
      Every day from 6:00 to 20:00 [10 days]
  • [5] Showa Oga Peninsula IC-Gojome Hachirogata IC (upper and lower lines)
    • May 23rd (Monday) -26th (Thursday), 4th year of Reiwa
      Every day from 6:00 to 20:00 [4 days]
    • May 30th (Monday) -June 2nd (Thursday), 4th year of Reiwa
      Every day from 6:00 to 20:00 [4 days]
    • June 6th (Monday) to 9th (Thursday), 4th year of Reiwa
      Every day from 6:00 to 20:00 [4 days]
  • The regulation start time is from 9 o'clock only every Monday.
  • It takes about 15 minutes to wait. (Excluding Saturdays and Sundays)
  • It may be canceled depending on the weather, so please check the latest information from websites such as "DraTra" when using the Expressway.
Image image of each traffic regulation date and time
[Legend] image of each traffic regulation date and time

Four. Detour

Closed section

  • [1] Between Akita Kita IC and Gojome Hachirogata IC (upper and lower lines)
  • [2] Showa Oga Peninsula IC-Gojome Hachirogata IC (upper and lower lines)
  • [3] Showa Oga Peninsula IC-Kotooka Moridake IC (upper and lower lines)

Five. Construction details

Pavement repair work

We will repair the pavement of the provisional two-lane section and install a wire rope to the median strip.

Photo before construction
Before construction
Photo after construction (image)
After construction (image)

6. About transfer fee adjustment due to traffic closure

Attachment-4 [PDF: 144KB]

For customers who temporarily flow out of the Expressway due to nighttime closure, bypass the closed section, and transfer in the same direction again, we will make a "transfer adjustment" to adjust the toll according to the section used.

7. How to obtain traffic information

  • DraPla", a site full of useful information on Expressway nationwide
    【address】
    PC version (https://www.driveplaza.com/)
    Mobile version (http://m.driveplaza.com/)
    Smartphone version (http://www.driveplaza.com/smp/)
  • Expressway traffic information service "Drive Traffic (DraTra)"
    (https://www.drivetraffic.jp/construction-regulation)
    It provides real-time road traffic information and traffic congestion prediction.
    【address】
    PC version (https://www.drivetraffic.jp/)
    Mobile version (http://m.drivetraffic.jp/)
    Smartphone version (http://www.drivetraffic.jp/smp/)
  • NEXCO東日本お客さまセンター
    24時間365日オペレーターが応対いたします。
    【電話番号】
    0570-024-024 または 03-5308-2424
  • 日本道路交通情報センター(JARTIC)
    【電話番号】
    全国共通ダイヤル 050-3369-6666 (携帯短縮ダイヤル #8011
    ※全国どこからでも最寄りの情報センターに接続します。
    秋田情報 050-3369-6605
    東北地方高速情報 050-3369-6761
  • Highway radio
    Highway radio (AM1620kHz)
    The section that is broadcasting is indicated by the sign on Expressway.
  • Official Twitter account "NEXCO EAST (Tohoku)" ( @e_nexco_tohoku ) Also delivers information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.