[E6] Joban Expressway Iwaki Yumoto IC
Implementation of night lamp closure

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 915KB]

April 11, 4th year of Reiwa
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Iwaki management office

NEXCO EAST Iwaki Management Office (Iwaki City, Fukushima Prefecture) will close the night lamp at the E6 Joban Expressway Iwaki Yumoto Interchange (IC) for pavement repair work as follows.
Therefore, when you go out, please leave with plenty of time, and when you drive, please detour to National Highway No. 6 etc.
We apologize for the inconvenience caused to customers who use the Expressway, but we ask for your understanding and cooperation in the construction work necessary to use the Expressway safely and comfortably.

1. Closed section

[1] Joban Expressway Iwaki Yumoto IC
Entrance lamp to Tokyo (A lamp)

[2] Joban Expressway Iwaki Yumoto IC
Entrance lamp (C lamp) to Sendai and Koriyama

(Location map)
Image of (position map)

2. Closed date and time

[1] Joban Expressway Iwaki Yumoto IC Entrance ramp to Tokyo (A ramp)
May 9th (Monday) to 12th (Thursday), 4th year of Reiwa
Every night from 20:00 to 5:00 the next day
[Preliminary day: May 23rd (Monday) -27th (Friday)]

[2] Joban Expressway Iwaki Yumoto IC Sendai, entrance ramp to Koriyama (C ramp)
May 13th (Fri) to 20th (Fri), 4th year of Reiwa
Every night from 20:00 to 5:00 the next day
[Preliminary day: May 23rd (Monday) -27th (Friday)]

  • The nighttime closure will be from 20:00 on weekdays to 5:00 the next morning.
    (Friday night construction will be done until 5 am on Saturday)
  • It may be canceled depending on the weather, so please check the latest information from websites such as "DraTra" when using the Expressway.
Image of closed days

Usage Guide

Legend image image
  • For the construction on the preliminary day, priority will be given to the entrance lamp (A lamp) to the Tokyo area, and as soon as the construction is completed, the entrance lamp (C lamp) to Sendai and Koriyama will be installed.

3. Detour

National Highway 6, National Highway 49, National Highway 289, Prefectural Highway 66, Prefectural Highway 14 (Attachment [PDF: 379KB])

Four. Construction content

Iwaki Yumoto IC A lamp / C lamp pavement repair work will be carried out.

Photo before construction
Before construction
Image of post-construction image
Image after construction

Five. How to obtain traffic information

  • DraPla", a site full of useful information on Expressway nationwide
    【address】
    PC version (https://www.driveplaza.com/)
    Mobile version (http://m.driveplaza.com/)
    Smartphone version (http://www.driveplaza.com/smp/)
  • Expressway traffic information service "Drive Traffic (DraTra)"
    (https://www.drivetraffic.jp/construction-regulation)
    It provides real-time road traffic information and traffic congestion prediction.
    【address】
    PC version (https://www.drivetraffic.jp/)
    Mobile version (http://m.drivetraffic.jp/)
    Smartphone version (http://www.drivetraffic.jp/smp/)
  • NEXCO東日本お客さまセンター
    24時間365日オペレーターが応対いたします。
    【電話番号】
    0570-024-024 または 03-5308-2424
  • 日本道路交通情報センター(JARTIC)
    【電話番号】
    全国共通ダイヤル 050-3369-6666 (携帯短縮ダイヤル #8011
    ※全国どこからでも最寄りの情報センターに接続します。
    福島情報 050-3369-6607
    東北地方高速情報 050-3369-6761
  • Highway radio
    Highway radio (AM1620kHz)
    The section that is broadcasting is indicated by the sign on Expressway.
  • Official Twitter account "NEXCO EAST (Tohoku)" ( @e_nexco_tohoku ) Also delivers information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.