[E6] Joban Expressway (between Shinchi IC and Yamamoto IC)
Implementation of nighttime closure

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E6] Joban Expressway (between Shinchi IC and Yamamoto IC) Nighttime closure

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 596KB]

令和3年10月22日
東日本高速道路株式会社
東北支社仙台東管理事務所

NEXCO EAST Sendai East Management Office (Sendai City, Miyagi Prefecture) is located between the Joban Expressway E6 Shinchi Interchange (IC) and Yamamoto IC (upper and lower lanes) on the provisional two-lane section (one lane on each side). , Due to wire rope type lane division fence installation work, etc., we will implement nighttime closure as follows.
Therefore, when you go out, please leave with plenty of time, and when you drive, please make a detour to National Highway No. 6 etc.
We apologize for the inconvenience caused to customers who use the Expressway, but we ask for your understanding and cooperation in the construction work necessary to use the Expressway safely and comfortably.

1. Closed section

 常磐自動車道 新地IC~山元IC間(上下線)
別添資料-1【PDF:262KB】

(Location map)
Image of (position map)

2. Closed date and time

November 17th (Wednesday) to 19th (Friday), 3rd year of Reiwa
Every night from 20:00 to 5:00 the next day
November 24th (Wednesday) -26th (Friday), 3rd year of Reiwa
Every night from 20:00 to 5:00 the next day
[Preliminary day: November 29th (Monday) -December 1st (Wednesday)]

  • The nighttime closure will be from 20:00 on weekdays to 5:00 the next morning.
    (Friday night work will be done until early Saturday morning)
  • It may be canceled depending on the weather, so please check the latest information from websites such as "DraTra" when using the Expressway.
Image of closed days

3. Detour

別添資料-1【PDF:262KB】

National highway No. 113, national highway No. 6

Four. Construction content

As a measure to prevent head-on collision accidents in the provisional two-lane section, we will install a wire rope type lane division fence.

Photo before construction
Before construction
Photo after construction (image)
After construction (image)

Five. Regarding transit fare adjustment due to suspension of traffic

別添資料-2【PDF:131KB】

For passengers who leave the Expressway once due to a nighttime suspension and bypass the closed section and transfer again in the same direction, we will make a "transit adjustment" to adjust the toll according to the section used.

6. How to obtain traffic information

  • DraPla", a site full of useful information on Expressway nationwide
    【address】
    PC version (https://www.driveplaza.com/)
    Mobile version (http://m.driveplaza.com/)
    Smartphone version (http://www.driveplaza.com/smp/)
  • Expressway traffic information service "Drive Traffic (DraTra)"
    (https://www.drivetraffic.jp/construction-regulation)
    It provides real-time road traffic information and traffic congestion prediction.
    【address】
    PC version (https://www.drivetraffic.jp/)
    Mobile version (http://m.drivetraffic.jp/)
    Smartphone version (http://www.drivetraffic.jp/smp/)
  • NEXCO東日本お客さまセンター
    24時間365日オペレーターが応対いたします。
    【電話番号】
    0570-024-024 または 03-5308-2424
  • 日本道路交通情報センター(JARTIC)
    【電話番号】
    全国共通ダイヤル 050-3369-6666 (携帯短縮ダイヤル #8011
    ※全国どこからでも最寄りの情報センターに接続します。
    宮城情報 050-3369-6604
    東北地方高速情報 050-3369-6761
  • Highway radio
    Highway radio (AM1620kHz)
    The section that is broadcasting is indicated by the sign on Expressway.
  • Official Twitter account "NEXCO EAST (Tohoku)" (@E_nexco_tohoku) Also delivers information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.