[E6] Sendai-Hokubu Road (between Rifu JCT and Tomiya IC)
Implementation of nighttime closure

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E6] Sendai-Hokubu Road (between Rifu JCT and Tomiya IC) Nighttime closure

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 663KB]

September 3, 3rd year of Reiwa
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Sendai East Management Office

NEXCO EAST Sendai East Management Office (Sendai City, Miyagi Prefecture) has a provisional two-lane section (one lane on each side) between E6 Sendai-Hokubu Road Department Road Rifu Junction (JCT) and Tomiya Interchange (IC). We will close the road at night to install a wire rope type lane division fence.
Therefore, when you go out, please leave with plenty of time, and when you drive, please make a detour to Route 4.
Expressway to the customers, which is available sorry now decided to apologize for inconvenience, Expressway to construction work required in order to use the safe and comfortable, thank you for your understanding and cooperation.

1. Closed section

 仙台北部道路 利府JCT~富谷IC間(上下線)
別添資料-1【PDF:172KB】

(Location map)
Image of (position map)

2. Closed date and time

Reiwa 3rd September 27th (Monday) -October 13th (Wednesday)
Every night from 20:00 to 5:00 the next day
[Preliminary day: Thursday, October 14th to Friday, October 22nd, 3rd year of Reiwa]

  • The nighttime closure will be from 20:00 on weekdays to 5:00 the next morning.
    (Friday night construction will be done until 5 am on Saturday)
  • It may be canceled depending on the weather, so please check the latest information from websites such as "DraTra" when using the Expressway.
Image of closed days

3. Detour

別添資料-1【PDF:172KB】

National highway 4, prefectural highway 35, prefectural highway 3

Four. Construction content

Wire rope type lane division fence installation work

A wire rope type lane division fence will be installed as a measure to prevent head-on collision accidents in the provisional two-lane section.

Photo before installation
Before installation
Photo after installation (image)
After installation (image)

Five. Regarding transit fare adjustment due to suspension of traffic

Attachment-2 [PDF: 170KB]

For passengers who leave the Expressway once due to a nighttime suspension and bypass the closed section and transfer again in the same direction, we will make a "transit adjustment" to adjust the toll according to the section used.

6. How to obtain traffic information

  • DraPla", a site full of useful information on Expressway nationwide
    【address】
    PC version (https://www.driveplaza.com/)
    Mobile version (http://m.driveplaza.com/)
    Smartphone version (http://www.driveplaza.com/smp/)
  • Expressway traffic information service "Drive Traffic (DraTra)"
    (https://www.drivetraffic.jp/construction-regulation)
    It provides real-time road traffic information and traffic congestion prediction.
    【address】
    PC version (https://www.drivetraffic.jp/)
    Mobile version (http://m.drivetraffic.jp/)
    Smartphone version (http://www.drivetraffic.jp/smp/)
  • NEXCO東日本お客さまセンター
    24時間365日オペレーターが応対いたします。
    【電話番号】
    0570-024-024 または 03-5308-2424
  • 日本道路交通情報センター(JARTIC)
    【電話番号】
    全国共通ダイヤル 050-3369-6666(携帯短縮ダイヤル #8011
    ※全国どこからでも最寄りの情報センターに接続します。
    東北地方・宮城情報 050-3369-6604
    東北地方高速情報 050-3369-6761
  • Highway radio
    Highway radio (AM1620kHz)
    The section that is broadcasting is indicated by the sign on Expressway.
  • Official Twitter account "NEXCO EAST (Tohoku)" ( @e_nexco_tohoku ) Also delivers information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.