[E4] Tohoku Expressway Sukagawa IC Lamp Department
Implementation of night closure

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E4] Tohoku Expressway Sukagawa IC Lamp Department closed at night

The latest regulatory information isDraTraPlease see.

October 7, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Koriyama management office

NEXCO EAST Koriyama Management Office (Koriyama City, Fukushima Prefecture) will close the ramp section at night at the E4 Tohoku Expressway Sukagawa Interchange (IC) for pavement repair work as follows.
Therefore, when you go out, please leave with plenty of time, and when you drive, please make a detour to Route 4.
Expressway to the customers, which is available sorry now decided to apologize for inconvenience, Expressway to construction work required in order to use the safe and comfortable, thank you for your understanding and cooperation.

1. Closed place

[1] Tohoku Expressway Sukagawa IC entrance ramp to the In-bound line
[2] Tohoku Expressway Sukagawa IC entrance lamp
[3] Tohoku Expressway Sukagawa IC Exit Lamp
Attachment [PDF: 321KB]

(Location map)

Image of (position map)

Geographical Survey Institute (GSI) ( https://maps.gsi.go.jp/ ), East Japan Expressway Co., Ltd.

2. Closing date and time

[1] Entrance ramp to Sukagawa IC In-bound line
2020 Monday, November 9th, Tuesday, November 10th, every night from 20:00 to 6:00 the next day
[Preliminary day: 2020 November 11th (Wednesday) to 13th (Friday)]
[2] Sukagawa IC entrance lamp
2020 Monday, November 16th, Tuesday, November 17th, every night from 20:00 to 6:00 the next day
[Preliminary day: 2020 November 18th (Wednesday) to 20th (Friday)]
[3] Sukagawa IC exit lamp
2020 Tuesday, November 24th, 20: 00-6: 00 the next day
[Preliminary day: 2020 November 25th (Wednesday) -27th (Friday)]

  • It will be closed at night from 20:00 on weekdays to 6:00 the next morning.
    (Friday night construction will be done until 6 am on Saturday)
  • It may be canceled depending on the weather, so please check the latest information from websites such as "DraTra" when using the Expressway.
Image of closing date

3. Detour

National highway 4, prefectural highway 47, prefectural highway 63, prefectural highway 67
Attachment [PDF: 321KB]

Four. Construction content

We will repair the damaged pavement.

Photo before repair
Before repair
Photo after repair (image)
After repair (image)

Five. How to obtain traffic information

  • " DraPla", a site full of useful information on Expressway across Japan
    【address】
    PC version (https://www.driveplaza.com/)
    Mobile version (http://m.driveplaza.com/)
    Smartphone version (http://www.driveplaza.com/smp/)
  • Expressway traffic information service "Drive Traffic (DraTra)"
    (https://www.drivetraffic.jp/construction-regulation)
    It provides real-time road traffic information and traffic congestion prediction.
    【address】
    PC version (https://www.drivetraffic.jp/)
    Mobile version (http://m.drivetraffic.jp/)
    Smartphone version (http://www.drivetraffic.jp/smp/)
  • NEXCO東日本お客さまセンター
    24時間365日オペレーターが応対いたします。
    【電話番号】
    0570-024-024 または 03-5308-2424
  • ハイウェイテレホン
    電話でリアルタイムの交通情報(5分更新)を24時間入手できます。
    【電話番号】
    郡山局 024-961-1620
    (携帯電話・PHS短縮ダイヤル #8162
  • 日本道路交通情報センター(JARTIC)
    【電話番号】
    全国共通ダイヤル 050-3369-6666(携帯短縮ダイヤル #8011
    ※全国どこからでも最寄りの情報センターに接続します。
    福島情報 050-3369-6607
    東北地方高速情報 050-3369-6761
  • Highway radio
    Highway radio (AM1620kHz)
    The section that is broadcasting is indicated by the sign on Expressway.
  • Official Twitter account "NEXCO EAST (Tohoku)" ( @e_nexco_tohoku ) Also delivers information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.