[E48] Yamagata Expressway (between Sagae IC and Gassan IC)
Implementation of traffic closure at night

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E48] Yamagata Expressway (between Sagae IC and Gassan IC) Closed at night

The latest regulatory information isDraTraPlease see.

September 28, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Yamagata management office

NEXCO EAST Yamagata Management Office (Yamagata City, Yamagata Prefecture) has closed night traffic between the E48 Yamagata Expressway Sagae Interchange (IC) and Gassan IC for pavement repair work. I will.
Therefore, when you go out, please leave with plenty of time, and when you drive, please make a detour to Route 112.
Expressway to the customers, which is available sorry now decided to apologize for inconvenience, Expressway to construction work required in order to use the safe and comfortable, thank you for your understanding and cooperation.

1. Closed section

[1] Between Yamagata Expressway Sagae IC and Gassan IC (up and down lines)
[2] Between Yamagata Expressway Nishikawa IC and Gassan IC (up and down lines)

Attachment-1 [PDF: 360KB]

(Location map)

Image of (position map)

2. Closed date and time

[1] Between Sagae IC and Gassan IC (up and down lines)
October 26th (Monday) and 27th (Tuesday), 2020 every night from 20:00 to 6:00 the next day
[Preliminary days: Thursday, November 5th, Friday, November 6th]
[2] Between Nishikawa IC and Gassan IC (up and down lines)
October 28th (Wednesday) to 30th (Friday), November 4th (Wednesday), 2020 20:00 to 6:00 every night
[Preliminary days: Thursday, November 5th, Friday, November 6th]

  • Closing at night is from 20:00 on weekdays to 6am the next morning.
    (Friday night construction will be done until 6 am on Saturday)
  • It may be canceled depending on the weather, so please check the latest information from websites such as "DraTra" when using the Expressway.
Image of closed days

3. Detour

National Route 112 (Attachment-1 [PDF: 360KB])

Four. Construction content

Pavement repair work

We will repair the damaged pavement.

Photo before repair
Before repair
Photo after repair (image)
After repair (image)

Five. Regarding transit fare adjustment due to suspension of traffic

Attachment-2 [PDF: 79KB]

For passengers who leave the Expressway once due to a nighttime suspension and bypass the closed section and transfer again in the same direction, we will make a "transit adjustment" to adjust the toll according to the section used.

6. How to obtain traffic information

  • " DraPla", a site full of useful information on Expressway across Japan
    【address】
    PC version (https://www.driveplaza.com/)
    Mobile version (http://m.driveplaza.com/)
    Smartphone version (http://www.driveplaza.com/smp/)
  • Expressway traffic information service "Drive Traffic (DraTra)"
    (https://www.drivetraffic.jp/construction-regulation)
    It provides real-time road traffic information and traffic congestion prediction.
    【address】
    PC version (https://www.drivetraffic.jp/)
    Mobile version (http://m.drivetraffic.jp/)
    Smartphone version (http://www.drivetraffic.jp/smp/)
  • NEXCO東日本お客さまセンター
    24時間365日オペレーターが応対いたします。
    【電話番号】
    0570-024-024 または 03-5308-2424
  • ハイウェイテレホン
    電話でリアルタイムの交通情報(5分更新)を24時間入手できます。
    【電話番号】
    山形局 023-685-1620
    (携帯電話・PHS短縮ダイヤル #8162
  • 日本道路交通情報センター(JARTIC)
    【電話番号】
    全国共通ダイヤル 050-3369-6666(携帯短縮ダイヤル #8011
    ※全国どこからでも最寄りの情報センターに接続します。
    山形情報 050-3369-6606
    東北地方高速情報 050-3369-6761
  • Highway radio
    Highway radio (AM1620kHz)
    The section that is broadcasting is indicated by the sign on Expressway.
  • Official Twitter account "NEXCO EAST (Tohoku)" ( @e_nexco_tohoku ) Also delivers information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.