[E46] Akita Expressway (between Yuda IC and Omagari IC) [E13] Yuzawa-Yokote Road (between Yuzawa IC and Yokote IC) Night closure
- Corporate Top
- Press Room
- Press Release Tohoku office
- [E46] Akita Expressway (between Yuda IC and Omagari IC) [E13] Yuzawa-Yokote Road (between Yuzawa IC and Yokote IC) Night closure
May 14, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Yokote Management Office
NEXCO EAST Yokote Management Office (Yokote City, Akita Prefecture) E46 Akita Expressway Yuda Interchange (IC) -Omagari IC and E13 Yuzawa-Yokote Road between Yuzawa IC and Yokote IC will be closed at night as follows for tunnel reinforcement work, sign renewal work and damaged pavement repair work.
We apologize for the inconvenience to our customers, but we ask for your understanding and cooperation so that you may have some time when you go out.
1 closed section
[1] Between Akita Expressway Yuda IC and Omagari IC (upper and lower lines)
Yuzawa-Yokote Road between Yuzawa IC and Yokote IC (upper and lower lines)
[2] Between Akita Expressway Yuda IC and Omagari IC (upper and lower lines)
2 suspension period
[1] 10 nights from May 25 (Mon) to June 5 (Fri), 2020
Preliminary day: June 8 (Mon) to 19 (Fri), 2020
[2] 2020 June 8th (Monday) to 19th (Friday) 10 nights
Preliminary day: 2020 June 22 (Mon) -July 3 (Fri)
- As a general rule, we do not work on Saturdays and Sundays.
- Please be sure to check the latest information on websites such as “DraTra” when using the Expressway, as the closing date may change depending on the weather.
3 closed hours
From 20:00 to 6:00 the next day
4 Detour
[1] National Route 107, National Route 13, Omagari West Road [Attachment-1] [PDF: 364KB]
[2] National Route 107, National Route 13, Omagari West Road [Attachment-1] [PDF: 364KB]
5 Construction content
We will carry out tunnel reinforcement work, sign renewal work, and repair work for damaged pavements.
6 Regarding transfer fare adjustment due to suspension of traffic
Passengers who once flow out of the Expressway due to a traffic closure, bypass the traffic closure section, and then transfer again in the same direction, will make a "transfer adjustment" to adjust the toll according to the section used.
For details of the connection adjustment, Attachment [PDF: 162KB] Please refer to.
7 Information provision
Information such as road traffic information
- " DraPla", a site full of useful information on Expressway across Japan
【address】PC version
Mobile version (http://m.driveplaza.com/)
Smartphone version (http://www.driveplaza.com/smp/) - Expressway traffic information service "Drive Traffic (DraTra)"
For the latest regulatory information, see DraTra "Please refer to the.
- NEXCO EAST Customer Center
An operator is available 24 hours a day, 365 days a year.
【phone number】 - Highway telephone
You can get real-time traffic information (5 minutes update) 24 hours a day by phone.
【phone number】 - (公財)日本道路交通情報センター
050-3369-6603(岩手情報)
050-3369-6605(秋田情報)
050-3369-6761(東北地方高速情報) - Highway radio
Highway radio (AM1620kHz)
The section that is broadcasting is announced by the signs on the Expressway.
Wide-area road information is provided in an easy-to-understand manner on the monitor screens installed in SA / PA.
- Official Twitter account "NEXCO EAST (Tohoku)" ( @e_nexco_tohoku ) Also delivers information.
8 Efforts to minimize inconvenience to customers due to construction work
Strengthening of information provision
In addition to information boards (electric bulletin boards) on the Expressway, we plan to close posters, leaflets, and rest facilities at each tollgate on the Akita Expressway (Yuda IC-Kyowa IC) and Yuzawa-Yokote Road (Yuzawa IC-Yokote IC). We will provide standing signs and leaflets to let you know in advance.
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.