[E6] Implementation of night road closures due to the construction of the Joban Expressway National Highway No. 49 (flat bypass) Iwaki Chuo IC Intersection-Mukomachida Intersection

-Constructing bridge construction-

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E6] National highway No. 49 (flat bypass) associated with the construction of the Joban Expressway Iwaki Chuo Intersection-Mukomachida Intersection

August 5, 2019
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Iwaki construction office

NEXCO EAST in Iwaki Construction Office (Iwaki City, Fukushima Prefecture), E6 Joban Expressway with the Iwaki center interchange (IC) ~ Hirono IC between the four-lane construction, E6 Joban Expressway and National Highway 49 No. (flat bypass) intersect Due to the construction of the bridge at the location, we will close the road at night in some sections of National Highway No. 49 (Hira Bypass). Congestion due to this road closure is not predicted, but please check the road information etc. before going out.
We apologize for the inconvenience caused to those who live along the road and those who use National Route 49 (Taira Bypass), but we will do our best to minimize the inconvenience. Thank you for your collaboration.

1 closed section

National Route 49 (flat bypass) Iwaki Chuo IC Intersection-Mukomachida Intersection
Extension: about 300m
Address: Kiyoshi, Kitayoshima, Yoshima-cho, Iwaki, Fukushima Prefecture
Location diagram: See diagram below. (Detail is [Attachment 1] [PDF: 136KB] Please refer to)

Image image of closed section
Geographical Survey Institute (GSI) ( https://maps.gsi.go.jp/ ), Processed by East Japan Expressway Co., Ltd.

2 closed days

Target date 2019, August 26 (Monday), 28 days (water), 29 (Thursday)
Preparation day Monday, September 2 to 12th, 2019
Time 21:00 to 6:00 the next day
  • Construction period calendar (August and September)
  • Image of construction period calendar (August and September)
  • In case of stormy weather, the work will be postponed.
  • The decision to close the road will be made at 17:00 in the evening of the day.

3 detour

City road Kitamachida / Matsuzaka line, city road Onikoshi / Hanawa line, city road Odaikyocho / Kitayoshima line
Detail is [Attachment 1] [PDF: 136KB] Please refer to.

4 Construction details

Joban Expressway Due to the four-lane construction between Iwaki Chuo IC and Hirono IC, we will construct the Iwaki Chuo Bridge at the intersection of Joban Expressway and National Route 49. We will close the road to ensure the safety of people using Route 49.
Please refer to [Attachment 2] [PDF: 98KB] for details.

5 Information provision

  • NEXCO東日本お客さまセンター
    0570-024-024 または 03-5338-7524
  • 日本道路交通情報センター(JARTIC)の道路交通情報
    全国共通ダイヤル 050-3369-6666(携帯電話短縮ダイヤル #8011
    050-3369-6607(福島情報)
    インターネット
  • Road information board (national road)
  • VICS (available in VICS compatible car navigation etc.)

6 Efforts to minimize inconvenience to customers due to construction

[Strengthening information provision]
In addition to the national highway information board (electric bulletin board), we will prepare a leaflet at the roadside station near Taira Bypass to inform you in advance of the road closure schedule.

Image of poster / flyer image
《Poster / flyer image》
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.