[E4] Tohoku Expressway Kunimi Service Area Up and Down Line
At a temporary facility due to facility renewal work
We will further reduce sales and parking space
《Please use nearby SA / PA》
- Corporate Top
- Press Room
- Press Release Tohoku office
- [E4] Tohoku Expressway Kunimi Service Area Vertical Line We will reduce the number of parking spaces and the operation of temporary facilities as a result of facility renewal work. << Please use nearby SA / PA >>
May 10, 2019
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Fukushima Management Office
Nex-area Company Limited
Tohoku Branch
NEXCO EAST Fukushima Management Office (Fukushima City, Fukushima Prefecture) and Nexeria East Japan Tohoku Branch (Sendai City, Miyagi Prefecture), in order to deliver more comfortable and convenient services, E4 Tohoku Expressway Kunimi Service Area (SA) (upper and lower lines) is undergoing facility renewal work (overall improvement).
Along with this, we will switch to temporary facilities (shops, toilets, etc.) due to the reconstruction work of the current facility. You can continue to use the SA facility (operating in a temporary facility), but the current parking space will be further reduced, and the construction will be done while limiting the parking lot and sidewalk area.
Congestion is expected as the number of parking spaces decreases, so please use the nearby SA and parking area (PA) and take a break to relax.
We sincerely apologize for the inconvenience this may cause, as we will be reborn as a safer, more secure, more comfortable, and more convenient rest facility. Thank you for your understanding and cooperation.
The details of the regulations will be announced as soon as they are decided, along with the progress of construction work in the future.
1 Construction site
Tohoku Expressway Kunimi SA up and down line
2 Construction details
- Switching to temporary facilities (stands, toilets, etc.), reducing parking space
- Demolition work of existing buildings (shops, toilets, etc.)
Car model | Out-bound line | In-bound line | ||||||
---|---|---|---|---|---|---|---|---|
(Current) | → | Construction After start |
Increase or decrease | (Current) | → | Construction After start |
Increase or decrease | |
Small car | 51 units | → | 32 units | -19 units | 89 units | → | 32 units | -57 units |
Large car | 13 units | → | 13 units | ± 0 units | 12 units | → | 11 units | -One |
For both large vehicles and small vehicles | 8 units | → | 8 units | ± 0 units | 13 units | → | 9 units | -4 units |
Bus priority | 4 units | → | 4 units | ± 0 units | 3 units | → | 3 units | ± 0 units |
trailer | 3 units | → | 3 units | ± 0 units | 4 units | → | One | -3 units |
- For details, please see Attached Figure 1-1 [PDF: 370KB] 1-2 [PDF: 397KB].
- Temporary shops (with light meals), vending machines and temporary toilets (including multifunctional toilets), gas stations, and EV quick charging stands are available.
- Please see Attachment-2 [PDF: 156KB] for SA / PA that can be used in the neighborhood.
- The large / small combined mass indicates the number of units that can be used as a large vehicle.
- In-bound line will decrease, so please use a nearby SA / PA.
3 Construction start date
- Switching construction of the temporary stand-temporary toilets: 2019 May 21 days from (Tuesday) 9:00
- Demolition work of existing building: From the end of May of the first 2019
4 Customer contact
NEXCO東日本お客さまセンター(24時間オペレーターが対応します。)
・0570-024-024 または 03-5338-7524
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.