[Final report] Some customers have not installed winter tires! Full-scale arrival of winter
-Results of winter tire installation status survey (final report)-
- Corporate Top
- Press Room
- Press Release Tohoku office
- [Final report] Some customers have not installed winter tires! Full-scale arrival of winter
December 12, 2018
East Nippon Expressway Co., Ltd.
Tohoku office
NEXCO EAST Tohoku Regional Head Office (Sendai Aoba-ku), on the occasion marks the full-fledged snowfall period, aroused the exchange to the early winter tires, with the aim to educate the safe running of the snow-covered road driving, Expressway in We will survey the installation situation of winter tires and announce the results.
The percentage of winter tires installed in the Tohoku region has reached 95%, so this survey will be the final stage.
Since full-scale snowfall has also been observed, if you have not installed winter tires yet, Please change to early winter tires and drive safely when using the Expressway.
1 Survey results on Monday, December 10th (6th edition)
Survey location | Winter tire installation rate | Number of surveys this time | JMA observation data | |||
---|---|---|---|---|---|---|
This time survey (December 10) |
Last survey (December 3) |
Winter tires Number of installed |
Total number | First snow day (Observation point) |
||
Aomori Prefecture | E4 Tohoku Expressway Aomori IC | 100% | 100% | 39 | 39 | Last year: November 16 (Aomori City) this year: Nov. 22 Normal year: November 6 |
E4A Hachinohe Expressway Hachinohe IC | 100% | 100% | 42 | 42 | ||
Aomori prefecture total | 100% | 100% | 81 | 81 | ||
Iwate Prefecture | E4 Tohoku Expressway Morioka Minami IC | 99% | 97% | 149 | 150 | Last year: November 16 (Morioka City) this year: Nov. 21 Normal year: November 8 |
E4 Tohoku Expressway north Ezuriko IC | 100% | 97% | 81 | 81 | ||
Iwate prefecture total | 100% | 97% | 230 | 231 | ||
Miyagi Prefecture | E4 Tohoku Expressway Sendai Miyagi IC | 96% | 81% | 99 | 103 | Last year: November 19 (Sendai City) this year: Dec. 8 Normal year: November 24 |
E6 Sendai-Tobu Road Tobu Road Sendai Higashi IC | 95% | 63% | 99 | 104 | ||
Miyagi prefecture total | 96% | 72% | 198 | 207 | ||
Akita | E4 Tohoku Expressway Towada IC | 100% | 100% | 20 | 20 | Last year: November 16 (Akita City) this year: Nov. 22 Normal year: November 13 |
E7 Akita Expressway Akita Minami IC | 100% | 86% | 45 | 45 | ||
E46 Akita Expressway Yokote IC | 100% | 99% | 77 | 77 | ||
Akita prefecture total | 100% | 94% | 142 | 142 | ||
Yamagata Prefecture | E48 Yamagata Expressway Yamagata Kita IC | 100% | 95% | 55 | 55 | Last year: November 16 (Yamagata City) this year: November 23 Normal year: November 18 |
E48 Yamagata Expressway Tsuruoka IC | 100% | 92% | 15 | 15 | ||
Yamagata total | 100% | 94% | 70 | 70 | ||
Fukushima Prefecture | E4 Tohoku Expressway Fukushima Iisaka IC | 90% | 75% | 138 | 154 | Last year: November 19 (Fukushima City) this year: Dec. 8 Normal year: November 26 |
E4 Tohoku Expressway Koriyama IC | 89% | 70% | 157 | 176 | ||
E49 Ban-Etsu Expressway Aizuwakamatsu IC | 100% | 88% | 66 | 66 | ||
E6 Joban Expressway Iwaki Central IC | 90% | 73% | 181 | 201 | ||
Fukushima Prefecture total | 91% | 75% | 542 | 597 | ||
Tohoku Regional Head Office | 95% | 84% | 1,263 | 1,328 |
- Survey method: Visually check the tire type of the vehicle passing through the general lane at the toll gate. (About 3 hours each time)
- "IC" is an abbreviation for interchange.
- About the first snow day, it is the information as of the survey date.
This material is a press release "About the results of the winter tire installation situation survey (first) -Winter tire installation rate 17%, winter is just around the corner! Early tire replacement- (November 7, 2018 ) ”Is a continuous survey.
2 Request from NEXCO EAST Tohoku Branch
- Please put on early winter tires before snowfall.
Summer tires tend to slip on snowy roads, and slip accidents on winter roads can lead to serious accidents, so please replace them with winter tires early. - "Driving slowly and safely on snowy roads" please. Reference Material-1 [PDF: 188KB]
When driving on a snowy road at the beginning of the season, the feeling of safe driving on the snowy road may not be restored. Please do not operate suddenly and operate slowly and safely. - "Frequently gathering information before and after going out" please. Reference Material-2 [PDF: 1.4MB]
The weather on winter Expressway changes rapidly, so be sure to check the road and weather information before and during your trip.
In order to use the winter highway safely, securely and comfortably, NEXCO EAST enlightenment activities at SA, PA, IC, traffic safety campaign, "Drupa" HP 's winter highway We actively send out information such as lectures ".
- Dr. Mammoshi: A researcher who specializes in car and snow road safety
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.