[3rd] Winter tire installation rate is still 50%! Snow forecast from this week

-Results of winter tire installation status survey (3rd report)-

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [3rd] Winter tire installation rate is still 50%! Snow forecast from this week

November 21, 2018
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office

NEXCO EAST Tohoku Branch (Sendai-shi Aoba-ku), aiming at the early winter tire replacement, will aim to raise a safe driving of snow road driving, in the coming snowfall period, for winter use on expressway We will investigate the mounting condition of the tire and announce the result.

The installation rate of winter tires in Tohoku as a whole is 56%, which is higher than the previous survey (30%).

Since the possibility of snowfall tends to increase from this week, Please change to early winter tires and drive safely when using the Expressway.

1 Survey results on Monday, November 19th (3rd)

Survey location Winter tire installation rate Number of surveys this time JMA observation data
This time survey
(November 19th)
Last survey
(November 12)
Winter tires
Number of installed
Total number First snow day
(Observation point)
Aomori Prefecture E4 Tohoku Expressway Aomori IC 77% 55% 27 35 Last year: November 16 (Aomori City)
This year: unobserved
Normal year: November 6
E4A Hachinohe Expressway Hachinohe IC 44% 31% 27 61
Aomori prefecture total 56% 45% 54 96
Iwate Prefecture E4 Tohoku Expressway Morioka Minami IC 84% 49% 132 157 Last year: November 16 (Morioka City)
This year: unobserved
Normal year: November 8
E4 Tohoku Expressway north Ezuriko IC 55% 20% 44 80
Iwate prefecture total 74% 38% 176 237
Miyagi Prefecture E4 Tohoku Expressway Sendai Miyagi IC 50% 32% 59 117 Last year: November 19 (Sendai City)
This year: unobserved
Normal year: November 24
E6 Sendai-Tobu Road Tobu Road Sendai Higashi IC 37% 32% 36 97
Miyagi prefecture total 44% 32% 95 214
Akita E4 Tohoku Expressway Towada IC 79% 40% 15 19 Last year: November 16 (Akita City)
This year: unobserved
Normal year: November 13
E7 Akita Expressway Akita Minami IC 60% 28% 42 70
E46 Akita Expressway Yokote IC 73% 30% 347 476
Akita prefecture total 72% 31% 404 565
Yamagata Prefecture E48 Yamagata Expressway Yamagata Kita IC 76% 37% 38 50 Last year: November 16 (Yamagata City)
This year: unobserved
Normal year: November 18
E48 Yamagata Expressway Tsuruoka IC 52% 19% 11 21
Yamagata total 69% 31% 49 71
Fukushima Prefecture E4 Tohoku Expressway Fukushima Iisaka IC 40% 31% 47 118 Last year: November 19 (Fukushima City)
This year: unobserved
Normal year: November 26
E4 Tohoku Expressway Koriyama IC 52% 29% 102 198
E49 Ban-Etsu Expressway Aizuwakamatsu IC 34% 27% 36 106
E6 Joban Expressway Iwaki Central IC 31% 15% 69 223
Fukushima Prefecture total 39% twenty five% 254 645
Tohoku Regional Head Office 56% 30% 1,032 1,828
  • Survey method: Visually check the tire type of the vehicle passing through the general lane at the toll gate. (About 3 hours each time)
  • "IC" is an abbreviation for interchange.
  • About the first snow day, it is the information as of the survey date.

The next survey is scheduled for Monday, November 26 (publicized Wednesday, November 28).
(The survey date and publication date are subject to change without notice due to weather conditions.)
This material is a press release "About the results of the winter tire installation situation survey (first) -Winter tire installation rate 17%, winter is just around the corner! Early tire replacement- (November 7, 2018 ) ”Is a continuous survey.

2 Request from NEXCO EAST Tohoku Branch

  • Please put on early winter tires before snowfall.
    Summer tires tend to slip on snowy roads, and slip accidents on winter roads can lead to serious accidents, so please replace them with winter tires early.
  • "Driving slowly and safely on snowy roads" please. Reference Material-1 [PDF: 188KB]
    When driving on a snowy road at the beginning of the season, the feeling of safe driving on the snowy road may not be restored. Please do not operate suddenly and operate slowly and safely.
  • "Frequently gathering information before and after going out" please. Reference Material-2 [PDF: 1.4MB]
    The weather on winter Expressway changes rapidly, so be sure to check the road and weather information before and during your trip.

In order to use the winter highway safely, securely and comfortably, NEXCO EAST enlightenment activities at SA, PA, IC, traffic safety campaign, "Drupa" HP 's winter highway We actively send out information such as lectures ".

  • Dr. Mammoshi: A researcher who specializes in car and snow road safety
Image of Dr. Mammoshi
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.