[E13] Yonezawa Nan-Yo Road (between Yonezawa Kita IC and Nanyo Takahata IC)
About implementation of day and night continuous closure

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E13] Yonezawa Nan-Yo Road (between Yonezawa Kita IC and Nanyo Takahata IC) Day/Night continuous traffic closure

September 11, 2017
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Yamagata Management Office
Tohoku Regional Head Office Yamagata Construction Office

NEXCO EAST​ Yamagata Management Office (Yamagata Prefecture Yamagata City) and Yamagata Construction Office (Yamagata Prefecture Yamagata City) have two lane sections (one lane on one side) E13 Yonezawa Nan-Yo Road Yonezawa Kita Interchange (IC)-Nanyo Takahata IC will be closed for day and night as follows due to pavement repair, bridge inspection, maintenance work and detour switching work accompanying Yonezawa Kita Main Line tollgate construction To do.

We apologize for the inconvenience to our customers, but we ask for your understanding and cooperation as it is necessary to maintain a safe and comfortable environment on the Expressway.

1 closed section

Yonezawa Nan-Yo Road between Yonezawa Kita IC and Nanyo Takahata IC (upper and lower lines)

2 suspension period

  1. Upper and lower lines September 25 (Mon) 9: 00 ~ September 28 (Thu) 16: 00
    [1. Reserve day]
    September 28 (Thu) 16: 00 - November 2 (Thu) 16:00
  2. Downline line October 2 (Mon) 9: 00 ~ October 5 (Thu) 16: 00
    [2. Reserve day]
    October 5 (Thu) 16:00 - November 2 (Thu) 2017 16:00
  • There are no restrictions on Saturdays, Sundays and public holidays.
  • 1. If the suspension of up-and-down lines is postponed due to rain, etc., it will be postponed to the next week, and after that, 2. The implementation of Out-bound line suspension will be postponed.
  • It will be light rain, but it will be postponed if there is a possibility of heavy rain and strong wind.
    The decision to carry out continuous road closure during the day and night will be made at 5 am on the first day of implementation.

Image of closed days

Image of closed days

3 detour

National Route 113, National Route 13, National Route 121 Attachment [PDF: 252KB]

Image of detour

4 Construction content

We will perform pavement repair, bridge inspection, maintenance and repair work, and detour switching work accompanying Yonezawa Kita Main Line tollgate construction.

Image image of pavement repair work
Pavement repair work
Image of bridge inspection
Bridge inspection

5 Information provision

[Customer contact]

  • NEXCO東日本お客さまセンター(24時間オペレーターが対応します。)
    0570-024-024 または 03-5338-7524
  • ハイウェイテレホン(24時間音声案内)
    山形局 023-685-1620
  • (公財)日本道路交通情報センター
    050-3369-6606(山形情報)
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.