[E4] Tohoku Expressway (Kazuno Hachimantai IC outflow lamp)
About implementation of day and night continuous closure

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E4] Tohoku Expressway (Kazuno Hachimantai IC Outflow Lamp) About carrying out continuous day and night suspension of traffic

Aug. 2, 2017
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Towada Management Office

NEXCO EAST Towada Management Office (Kazuno-city, Akita Prefecture)E4 Tohoku Expressway Kazuno Hachimantai Interchange (IC) will be closed day and night as follows to repair damaged concrete at the bridge.

We sincerely apologize for the inconvenience this may cause to our customers, as this work is necessary to maintain a safe and comfortable environment on the Expressway. We appreciate your understanding and cooperation.

1 closed section

Tohoku Expressway Kazuno Hachimantai IC In-bound Line Outflow Lamp

2 suspension period

August 28 (Mon) 20:00 - September 2 (Sat) 7:00
Preliminary day: September 2 (Sat) - September 7 (Thu) 2017

Image of closed period

3 detour

National Route 103 / National Route 282 Attachment-1 [PDF: 308KB]

Image of detour

4 Construction content

We will repair damaged concrete on the lower surface of the pavement of the bridge and waterproof it together.

5 Customer contact

  NEXCO東日本お客さまセンター(24時間オペレーターが対応します。)
0570-024-024 または 03-5338-7524

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.