Tohoku Expressway "Iwate Prefecture" "Miyagi Prefecture" "Fukushima Prefecture"
Notice of day and night continuous traffic regulation due to large-scale bridge repair work

47 days from May 17 (Wed) - July 2 (Sun)
~ Expressway Renewal Project ~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • Tohoku Expressway "Iwate Prefecture" "Miyagi Prefecture" "Fukushima Prefecture" Notice of continuous day and night traffic due to large-scale bridge repair work
Image image of Expressway renewal project

April 17, 2017
East Nippon Expressway Co., Ltd.
Tohoku office

NEXCO EAST​ Tohoku Branch (Sendai-shi Aoba-ku), the​ Tohoku Expressway​ Iwate prefecture rockyard bridge (Iwasaki)Document-1 [PDF: 318KB] Hirosegawabashi in Miyagi Prefecture Document-2 [PDF:386KB], Azumabashi in Fukushima Prefecture Document-3 [PDF: 295KB] In order to replace the deteriorated reinforced concrete floor slab with a new floor slab, we will implement continuous day and night traffic regulation.

During the construction period, congestion and congestion of Expressway are expected. During construction Homepage for construction, Or traffic information will be posted on websites such as DraPla so please refer to it when using the Expressway.

In addition, traffic jam information will be provided near the IC in front of the construction section, so please refer to it as a detour.

This work is necessary to keep the Expressway network function healthy for a long period of time, so we appreciate your understanding and cooperation.

1 construction section

Tohoku Expressway

Image image of construction section

2 Day and night continuous traffic regulation period and traffic congestion prediction

(1) Regulation period
47 days from May 17 (Wed) - July 2 (Sun), 2017

Image of regulation period

(2) Congestion prediction
Congestion on the Expressway during the construction period and congestion in Fukushima prefecture on holidays (up to approximately 11km) are expected to occur, so please take time to go.

Image of traffic congestion prediction

3 Traffic restrictions

During the floor slab replacement work, we will reduce the section of each two lanes of up and down lines to one lane and consolidate it into one lane to enforce day and night continuous one lane regulation (two-way traffic regulation). For the first few days at the start and end of the construction period, there will be overtaking lane restrictions for the upper and lower lanes as a preparatory work for switching lanes.

4 How to obtain road traffic information

(1) Road traffic information available before going out

  • For the latest regulatory information, see DraTra "Please refer to the.
  • NEXCO EAST Road Traffic Information Site "Dora Tora "
    (Provides national Expressway traffic information)
    [PC]
    [Mobile] http://m.drivetraffic.jp/
  • ハイウェイテレホン
    5分毎に更新される高速道路の交通最新情報をハイウェイテレホン(自動音声)で24時間提供しています。
    盛岡局 019-639-1620
    仙台局 022-711-1620
    郡山局 024-961-1620
    (携帯電話・PHS短縮ダイヤル#8162
  • NEXCO東日本お客さまセンター
    (24時間オペレーターが対応します。)
    0570-024-024
    03-5338-7524(PHS・IP電話のお客さま)
  • (公財)日本道路交通情報センター(JARTIC)の道路交通情報
    050-3369-6761(東北地方・高速情報)
    インターネット

(2) Road traffic information available during driving

  • Road information board
  • Highway radio (AM1620kHz)
    Highway radio sections are indicated by signs on the Expressway.
  • Highway Information Terminal
    Wide-area road traffic information is reported on the monitor screens installed at SA and PA.
* Twitter's official account "NEXCO EAST (Tohoku)" (@e_nexco_tohoku ) Also delivers information.
Image image of Expressway renewal project

Expressway Renewal project
Now, bring safety and security to the next generation.
NEXCO EAST, in order to deliver safety and security to everyone,
Expressway We will work on the update and repair business.

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.