Expressway usage during the Obon season [Tohoku region version]

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • Expressway usage during the Obon season [Tohoku region version]

August 18, 2014
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office

NEXCO EAST Tohoku Regional Head Office (Aoba Ward, Sendai City) is a Expressway in the Tohoku region managed by the Company during the Obon season [11th August 2014 (Thursday) to 17th August 2014 (Sunday)] We will inform you about the usage status of.

 During this period, traffic volume decreased and traffic congestion (*1) increased compared to last year.

1 Number of units used

[Average traffic volume on 7 cross sections of main line]

  • All cars: About 92% of the previous year (about 35,000 units/day)
  • Vehicle type
    : Small vehicles (light vehicles, ordinary vehicles) About 92% of the previous year (about 30 thousand units/day)
    : Large vehicles (medium-sized vehicles, large vehicles, oversized vehicles) About 96% of the previous year (about 40,000 units/day)
    Attachment-1 [PDF: 69KB]
  • Peak: Out-bound line is Wednesday 13th August, In-bound line is Saturday 16th August
    Attachment-2 [PDF: 100KB]

[Number of interchanges used (number of vehicles passing through exit toll gates, etc.)]

  • All cars: about 92% of the previous year (about 392,000 units/day)
  • Vehicle type
    : Small vehicles: about 92% of the previous year (about 349,000 units/day)
    : Large vehicles about 98% of the previous year (about 43,000 units/day)
    Attachment-3 [PDF: 73KB]
  • By prefecture [YoY change]
    Aomori: About 93% (about 30 thousand units/day), Iwate: About 87% (about 55,000 units/day), Akita: About 88% (about 36,000 units/day), Miyagi: About 95 % (About 114,000 units/day), Yamagata: about 90% (about 59,000 units/day), Fukushima: about 97% (about 98,000 units/day)
    Attachment-4 [PDF: 90KB]

2 congestion

Attachment-5 [PDF:196KB]

  • Congestion of 10 km or more on the main line occurred 12 times in the Out-bound direction (3 times from the previous year) and 23 times in the In-bound direction (+8 times from the previous year) for a total of 35 times (+5 times from the previous year).
  • The maximum length of traffic congestion on the main line is 31.0 km (-7.6 km compared to the previous year), and the Tohoku Expressway Ohira Interchange (IC)-Ichinoseki on Saturday, August 16 (11:17-22:30, peak time 17:43) It occurred between ICs (In-bound line). This traffic congestion was caused by traffic congestion and the sag area*2 near the Furukawa IC.
  • The amount of traffic congestion was approximately 2,006 km/h (1,755 km/h in the previous year), an increase of approximately 10%.
  • 1 Congestion extension (km) × congestion time (h) ÷ 2
  • 2 Out-bound from the hill In-bound portion of the change in slope

Comparison period

Image of comparison period
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.