About result of winter tire wearing situation investigation (the first)
-Starting efforts to promote early replacement of winter tires-
- Corporate Top
- Press Room
- Press Release Tohoku office
- About result of winter tire wearing situation investigation (the first)
November 4, 2010
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office
NEXCO EAST Tohoku Regional Head Office (Aoba Ward, Sendai City) is installing snow tires on Expressway to promote safer driving and encourage early replacement of tires during the snow season. We will conduct a survey and announce the results.
We plan to conduct regular surveys until the winter tire installation rate improves, and we will inform you.
This survey has been conducted since 1998, and this is the 13th time this year.
1. Implementation of winter tire installation status survey
[Scheduled date of the survey (announced next two days)]
- November 1 (Mon), 8 (Mon), 15 (Mon), 22 (Mon), 29 (Mon)
- The survey date and publication date may change without notice due to weather and other reasons.
- Depending on the installation rate situation, it will be carried out after the above. In that case, we will inform you again.
[Survey location]
- Interchange entrance: 14 places, parking area: 1 place, Tohoku Regional Head Office total 15 places
[Survey method]
- Visually check the tire type of the vehicle passing through the general lane at the tollgate.
- 100 cars or more than 30 minutes each time.
2. Survey results
[Monthly November 1st survey results (first)]
Survey location | Winter tire installation rate | JMA observation data | ||
---|---|---|---|---|
This time survey (November 1) | [Reference last year's survey] (November 2) | First snow day of a normal year (observation point) | ||
Aomori Prefecture | Tohoku Expressway Aomori IC | 21% | 26% | November 7 (Aomori City) |
Hachinohe Road Hachinohe IC | 7% | 18% | ||
Akita | Tohoku Expressway Towada IC | 10% | 23% | |
Akita Expressway Akita Minami IC | 2% | 17% | November 12 (Akita City) | |
Akita Michi Yokote IC | 27% | 13% | ||
Iwate Prefecture | Tohoku Expressway Morioka South IC | 3% | 9% | November 8 (Morioka City) |
Tohoku Expressway north Ezuriko IC | 1% | 19% | ||
Miyagi Prefecture | Tohoku Expressway Furukawa IC | 5% | 3% | |
Tohoku Expressway Sendai Miyagi IC | 9% | 9% | November 22 (Sendai City) | |
Yamagata Prefecture | Yamagata Expressway Yamagata Kita IC | 8% | 17% | November 16 (Yamagata City) |
Yamagata Road Kushibiki PA | 18% | 2% | November 17 (Sakata City) | |
Fukushima Prefecture | Tohoku Expressway Fukushima Iizaka IC | 13% | 17% | November 24 (Fukushima City) |
Tohoku Expressway Koriyama IC | 2% | 33% | ||
Ban-Etsu Expressway Aizuwakamatsu IC | 8% | 0% | November 17 (Aizuwakamatsu City) | |
Joban Expressway Iwaki Chuo IC | 4% | 4% | ||
Tohoku Regional Head Office | 9% | 12% |
- Survey method: Visually check the tire type of the vehicle passing through the general lane at the tollgate. (100 units or 30 minutes or more per time)
- "IC" stands for interchange, "PA" stands for parking area.
3. Reference data on snowfall and installation rate
[Relationship between last year's snowfall, accidents due to snowfall, and winter tire installation rate]
(NEXCO EAST Tohoku Regional Head Office survey)
Last year, there were 13 slip accidents on the snow-covered road surface on snowy days with snow (red circle in the above figure), 8 of which were summer tire car accidents. According to the winter tire survey at this time, the installation rate was 44%, and more than half of the customers on the Expressway that needed winter equipment were driving on snowy Expressway with summer tires.
[Relationship between snowfall in the year when the winter tire installation rate was low, accidents due to snowfall, and winter tire installation rate]
(NEXCO EAST Tohoku Regional Head Office survey)
(1) For a while after the snowfall that accompanies snowfall at the beginning of the season, slip accidents mainly caused by summer tire slips occur conspicuously.
(2) The rate of winter tire installation tends to improve after snowfall that accompanies snowfall.
(2) On snowy days with snow (red box in the above figure), 22 slip accidents occurred on snowy roads, 7 of which were summer tire car accidents.
[First snowfall days with snowfall and accident occurrence situation in the 6 prefectures of Tohoku in the past 5 years]
Year | First snowfall day with snow | Number of accidents during the first snow* | Winter tire installation rate |
---|---|---|---|
H17 | November 15 | 3(2) | 27% |
H18 | December 3 | 11(2) | 65% |
H19 | November 8 | 5(3) | 69% |
H20 | November 19 | 17(5) | 43% |
H21 | November 18 | 3(2) | 44% |
- Numbers in parentheses indicate the number of accidents due to vehicles equipped with summer tires.
4. Request from NEXCO EAST Tohoku Regional Head Office
(1) Please "install early winter tires before snowfall".
Every year, snowfall with snowfall at the beginning of the season causes a temporary increase in accidents caused by slipping summer tires. Slip accidents on the Expressway can lead to serious accidents and are extremely dangerous, so please change to winter tires as soon as possible.
(2) Please drive slowly and safely on snowy roads.
Even if you have winter tires installed, you should be careful on snowy roads. Please keep a sufficient distance between vehicles, keep the speed modest, do not operate sudden steering, sudden braking, etc., and drive slowly and safely. Also, the weather on the Expressway changes rapidly in winter, so please check the road information and weather information before and during your visit.
In order to use the winter highway safely, securely and comfortably, NEXCO EAST enlightenment activities at SA, PA, IC, traffic safety campaign, "Drupa" HP 's winter highway We actively send out information such as lectures ".
* Dr. Mammoshi: A researcher specializing in car and snow road safety