Implement measures to strengthen ETC lane speed control
~The opening time of the opening/closing bar in ETC lane will be delayed~
- Corporate Top
- Press Room
- Press Release Tohoku office
- We will implement measures to strengthen ETC lane passing speed control-The opening time of the open/close bar will be delayed in the ETC lane-
October 14, 2008
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office
NEXCO EAST Tohoku Regional Head Office (Sendai Aoba-ku, Regional Head Office length: Mikio Kashima), as part of the safety measures of the ETC lane, Sendai-Tobu Road in Iwanuma toll gate, the traveling speed suppression measures to slow down the time of opening of the ETC lane opening and closing bar I will carry it out.
1 Purpose of measures
In order to use ETC safely for our customers, we are asking through various media such as slowing down to 20 km/h or less when entering the ETC lane and traveling slowly on the ETC lane. However, there are many customers who are exceeding the speed significantly, and there is concern that a serious accident may occur.
Therefore, as a measure to ensure safety, we will implement speed control measures by delaying the operation of the ETC opening and closing bar at the Iwanuma Toll Gate on the Sendai-Tobu Road.
2 Implementation location and start time
Place:
Sendai-Tobu Road Iwanuma Toll Gate
All ETC lanes (entrance 1 lane, exit 1 lane)
Start operation:
From Monday, October 27, 2008 6:00 a.m.
3 Notes to be noted
If you approach the ETC lane at a speed exceeding 20 km/h, you may collide with the ETC opening/closing bar.
Please keep a sufficient distance between you and the preceding vehicle, reduce the speed to 20km/hour or less, enter the car, and drive slowly in the ETC lane after confirming that the ETC opening/closing bar is open.
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.