in Niigata Prefecture
About the results of the winter tire installation rate survey on Expressway (1st)
~40% are still not equipped with winter tires~
- Corporate Top
- Press Room
- Press Release Niigata office
- About the results of the winter tire installation rate survey on Expressway in Niigata Prefecture (1st)
November 17, 2020
East Nippon Expressway Co., Ltd.
Niigata Regional Head Office
NEXCO EAST Niigata Regional Head Office (Chuo Ward, Niigata City) will be installing winter tires for the first time this winter on service areas (SA) and parking areas (PA) on four Expressway in Niigata Prefecture on Tuesday, November 14th. As a result, the overall rate of winter tire installation was 59%, and the overall rate of non-installation of winter tires was 41%.
This survey was conducted to encourage early replacement of winter tires and to educate people about safe driving on winter roads. If you do not have winter tires installed yet, please change to winter tires as soon as possible and bring chains. Also, please drive safely when using Expressway.
1. 1. Outline of winter tire installation rate survey
Survey method
- Surveyor visually confirms the tire type of the vehicle parked in the SA / PA surveyed
- Investigate about 50 units at one location
- Large vehicles are oversized vehicles, large vehicles, medium-sized vehicles, and small vehicles are regular vehicles and light vehicles classified by charge type.
Survey place
E17 Kan-Etsu Expressway Tanigawadake PA,
E8 Hokuriku Expressway Kurosaki PA, Hokuriku Expressway Yoneyama SA,
E18 Joshinetsu Expressway Myoko SA
- All carried out on the Out-bound
Scheduled survey date / Result announcement date
- The survey date is subject to change due to weather and other reasons.
1st | 2nd | 3rd | 4th | |
---|---|---|---|---|
Scheduled survey date | 11/14 (Tue) | 11/21 (Tue) | 11/28 (Tue) | 12/5 (Tue) |
Results publication date | 11/17 (Friday) | 11/24 (Friday) | 12/1 (Fri) | 12/8 (Friday) |
2. Survey results (number of vehicles surveyed: 217)
Survey location | Classification | Number of surveys | Wearing rate | First snow day | |||
---|---|---|---|---|---|---|---|
Ordinary tire | Winter tires | Total | This survey 11/14 (Tue) |
【reference】 Contemporaneous survey R4/11/15 (Tue) |
|||
E17Kan-Etsu Expressway Tanigawadake PA (Out-bound) |
Small car | 9 | 8 | 17 | 47% | 31% | Last year: 12/13 This year: Not observed |
Large car | 4 | 30 | 34 | 88% | 74% | ||
Total | 13 | 38 | 51 | 75% | 60% | ||
E8 Hokuriku Expressway Kurosaki PA (Out-bound) |
Small car | 25 | 16 | 41 | 39% | 32% | Last year: 12/2 This year: Not observed |
Large car | 2 | 10 | 12 | 83% | 56% | ||
Total | 27 | 26 | 53 | 49% | 44% | ||
E8Hokuriku Expressway Yoneyama SA (Out-bound) |
Small car | 22 | 15 | 37 | 41% | 22% | Last year: 12/18 This year: Not observed |
Large car | 5 | 10 | 15 | 67% | 60% | ||
Total | 27 | 25 | 52 | 48% | 40% | ||
E18Joshin-Etsu Expressway Myoko SA (Out-bound) |
Small car | 20 | 18 | 38 | 47% | 15% | Last year: 12/2 This year: Not observed |
Large car | 2 | 21 | 23 | 91% | 88% | ||
Total | 22 | 39 | 61 | 64% | 40% | ||
total | Small car | 76 | 57 | 133 | 43% | twenty four% | |
Large car | 13 | 71 | 84 | 85% | 68% | ||
Total | 89 | 128 | 217 | 59% | 46% |
3. Three points for driving safely Expressway in winter
- Early winter equipment (installation of winter tires, carrying chains)
- Winter is almost here. Please change to winter tires as soon as possible.
- Make sure that the tread depth of your winter tires is no more than 50% worn down when new.
- During heavy snowfall, chains may be required even on winter tires. Please be sure to carry a chain.
- Drive safely and reduce your speed (especially in early winter!)
- Do not perform operations with the word ``sudden'' such as ``sudden steering,'' ``sudden acceleration,'' or ``sudden braking.''
Please drive slowly and safely, keeping a sufficient distance between vehicles. - In particular, at the beginning of winter, drivers tend to be more prone to accidents as their sense of driving on snowy roads has not yet recovered.
- Do not perform operations with the word ``sudden'' such as ``sudden steering,'' ``sudden acceleration,'' or ``sudden braking.''
- Frequently gathering information before and during your outing
- The weather on Expressway in winter can change rapidly, and even if it's sunny at your departure point, it may be snowing at your destination or passing point.
Please check road and weather information frequently before going out or while taking a break in the service area. - "Drive Traffic (DraTra)" provides real-time traffic information and information on Expressway road conditions (snowy road live camera).
- The weather on Expressway in winter can change rapidly, and even if it's sunny at your departure point, it may be snowing at your destination or passing point.
Four. About stacking during snowfall
- Stuck is more likely to occur during snowfall.
- NEXCO EAST official YouTube channel introduces the mechanism by which stacks occur and how to prevent them from occurring. Please take a look at it as a reference for safe driving.
Reference video: "How to avoid getting stuck! ? I will explain how the stack occurs.』
NEXCO EAST, in order to use the winter Expressway safely, securely, comfortably and conveniently, safety awareness activities and traffic safety campaigns at SA / PA / toll offices, and national Expressway / SA information site "DraPla" , "Dr. Mammoshi's Winter Expressway Course" is actively disseminating information on snowy roads.
- “ NEXCO EAST Niigata Regional Head Office X (formerly Twitter) @e_nexco_niigata”
We provide information on traffic jams, road closures, and driving/travel information in Niigata Prefecture. - Please register as a friend of the LINE account NEXCO EAST. Search ID → @e-nexco
We provide information on winter roads using LINE throughout NEXCO EAST jurisdiction. We will be disseminating useful information for winter road driving, such as road closure predictions and road images, so please register as a friend or register using a two-dimensional code.
"NEXCO EAST" LINE friend registration two-dimensional code
The NEXCO EAST Group has positioned the period from 2021 to 2025 as "a period to contribute to the achievement of the SDGs and transform toward a new future society", and is carrying out various initiatives.
We believe that the implementation of this winter tire installation rate survey will contribute to SDG Goal 3 as a business activity that will lead to the reduction of casualties due to traffic accidents.
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.