[E49] Ban-Etsu Expressway (between Niigata Chuo JCT and Tsugawa IC)
Notice of night traffic closure due to pavement repair work etc.

  • Corporate Top
  • Press Room
  • Press Release Niigata office
  • [E49] Ban-Etsu Expressway (Between Niigata Chuo JCT and Tsugawa IC) Notice of night closure due to pavement repair work etc.

July 16, 2020
East Nippon Expressway Co., Ltd.
Niigata Regional Head Office

NEXCO EAST Niigata Regional Head Office (Chuo-ku, Niigata City) E49 Ban-Etsu Expressway Niigata Chuo Junction (JCT) and Tsugawa Interchange (IC) We will carry out traffic closure at night..
We apologize for the inconvenience to our customers, but we ask for your understanding and cooperation as it is a closed road necessary for using the Expressway safely and comfortably.

Ban-Etsu Expressway closed at night (10 nights)

        
Road Ban-Etsu Expressway up and down line
section (1) Between Niigata Chuo JCT and Yasuda IC (2) Between Yasuda IC and Tsugawa IC
Implementation period From Wednesday, August 19 to 25th Tuesday (5 nights)
Reserve day: Wednesday, August 26-28 (Friday)
Monday, August 31-Friday, September 4 [5 nights]
Reserve day: September 7th (Monday) to 11th (Friday)
Time Every day from 20:00 to 6:00 the next morning
*Not available on Saturdays, Sundays, and nights (except Saturdays 0:00 to 6:00).
Regulation content Night traffic
Construction content Pavement repair work, tunnel equipment inspection and maintenance work
Remarks Both Niigata Parking Area (PA) and Gosen PA will be closed from 19:00 to 6:00 the next morning. The Aganogawa Service Area (SA) will be closed from 19:00 to 6:00 the next morning for both vertical lines.
  • Depending on the weather and construction progress, the regulation section/period/time may be changed or canceled.
    When using the service, such as a service that provides road traffic information of NEXCO EAST (Attachment 1 [PDF: 98KB]), please check the latest information.

●Closed sections and detours

Image of closed sections and detours

Please make a detour to Route 49 during the closed hours. Detail is Attachment 2 [PDF: 393KB] as well as Attachment 3 [PDF: 246KB] Please refer to the.

●Closed period

Image of the road closure period 1
Image of the road closure period image 2

● Construction overview

Ban-Etsu Expressway We will repair damaged road surface between Niigata Chuo JCT and Tsugawa IC, and construct/inspect/clean tunnel equipment in the provisional 2-lane section.

Photograph of road damage (between Niigata Chuo JCT and Yasuda IC)
Road damage (between Niigata Chuo JCT and Yasuda IC)
Photo of tunnel equipment inspection status (between Yasuda IC and Tsugawa IC)
Tunnel equipment inspection status (between Yasuda IC and Tsugawa IC)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.