[E49] Ban-Etsu Expressway (between Niigata Chuo JCT and Tsugawa IC)
Notice of night traffic closure due to pavement repair work etc.
- Corporate Top
- Press Room
- Press Release Niigata office
- [E49] Ban-Etsu Expressway (Between Niigata Chuo JCT and Tsugawa IC) Notice of night closure due to pavement repair work etc.
July 16, 2020
East Nippon Expressway Co., Ltd.
Niigata Regional Head Office
NEXCO EAST Niigata Regional Head Office (Chuo-ku, Niigata City) E49 Ban-Etsu Expressway Niigata Chuo Junction (JCT) and Tsugawa Interchange (IC) We will carry out traffic closure at night..
We apologize for the inconvenience to our customers, but we ask for your understanding and cooperation as it is a closed road necessary for using the Expressway safely and comfortably.
Ban-Etsu Expressway closed at night (10 nights)
Road | Ban-Etsu Expressway up and down line | |
---|---|---|
section | (1) Between Niigata Chuo JCT and Yasuda IC | (2) Between Yasuda IC and Tsugawa IC |
Implementation period | From Wednesday, August 19 to 25th Tuesday (5 nights) Reserve day: Wednesday, August 26-28 (Friday) |
Monday, August 31-Friday, September 4 [5 nights] Reserve day: September 7th (Monday) to 11th (Friday) |
Time | Every day from 20:00 to 6:00 the next morning *Not available on Saturdays, Sundays, and nights (except Saturdays 0:00 to 6:00). |
|
Regulation content | Night traffic | |
Construction content | Pavement repair work, tunnel equipment inspection and maintenance work | |
Remarks | Both Niigata Parking Area (PA) and Gosen PA will be closed from 19:00 to 6:00 the next morning. | The Aganogawa Service Area (SA) will be closed from 19:00 to 6:00 the next morning for both vertical lines. |
- Depending on the weather and construction progress, the regulation section/period/time may be changed or canceled.
When using the service, such as a service that provides road traffic information of NEXCO EAST (Attachment 1 [PDF: 98KB]), please check the latest information.
●Closed sections and detours
Please make a detour to Route 49 during the closed hours. Detail is Attachment 2 [PDF: 393KB] as well as Attachment 3 [PDF: 246KB] Please refer to the.
●Closed period
- Regarding transfer fare adjustment due to suspension of traffic Attachment 2 [PDF: 393KB] as well as Attachment 3 [PDF: 246KB] Please refer to the.
● Construction overview
Ban-Etsu Expressway We will repair damaged road surface between Niigata Chuo JCT and Tsugawa IC, and construct/inspect/clean tunnel equipment in the provisional 2-lane section.
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.