About the results of the winter tire installation rate survey on Expressway (2)
-Approximately 70% of small cars do not have winter tires installed-
- Corporate Top
- Press Room
- Press Release Niigata office
- About the results of the winter tire installation rate survey on Expressway (2)
November 22, 2018
East Nippon Expressway Co., Ltd.
Niigata Regional Head Office
NEXCO EAST Niigata Regional Head Office (Chuo-ku, Niigata City) will conduct a winter tire installation rate survey on four Expressway service areas (SA) and parking areas (PA) in Niigata Prefecture on Tuesday, November 20. did.
The winter tire installation rate was 86% for large cars and 34% for small cars, and although the installation rate improved from the previous survey, about 70% of small car customers still did not have winter tires installed.
Since it is predicted that snow will fall in the mountains of Niigata Prefecture from the night of November 22, please change to winter tires and carry a chain as soon as possible.
In addition, this survey is conducted for the purpose of promoting early replacement of winter tires and enlightening safe driving on snowy roads. It will be done every week until the installation rate reaches 90% for both large and small vehicles.
1 Outline of the winter tire installation rate survey
Survey method
- Surveyor visually confirms the tire type of the vehicle parked in the SA / PA surveyed
- Investigate about 50 units at one location
- Large vehicles are oversized vehicles, large vehicles, medium-sized vehicles, and small vehicles are regular vehicles and light vehicles classified by charge type.
* The number of vehicles surveyed may change depending on how the parking lot is used.
Survey place
E17 Kan-Etsu Expressway / Tanigawadake PA, E8 Hokuriku Expressway / Kurosaki PA, Hokuriku Expressway / Yoneyama SA, E18Joshin-Etsu Expressway / Myoko SA
* All conducted on the Out-bound line
Scheduled survey date / result announcement date * The survey date is subject to change due to weather and other reasons.
1st | 2nd | 3rd | 4th | |
---|---|---|---|---|
Scheduled survey date | 11/13 (Tue) | 11/20 (Tue) | 11/27 (Tue) | 12/4 (Tue) |
Results publication date | 11/15 (Thursday) | 11/22 (Thursday) | Thursday, November 29 | 12/6 (Thursday) |
2 Survey results (number of surveys: 228)
Survey place | Classification | Number of surveys | This time survey 11/20 (Tue) |
[Reference] last time 1st survey 11/13 (Tue) |
First snow day | ||
---|---|---|---|---|---|---|---|
Ordinary tire | Winter tires | Total | |||||
E17Kan-Etsu Expressway Tanigawadake PA (Out-bound) |
Small car | 25 | 7 | 32 | 22% | 0% | Last year: 11/15 This year: unobserved |
Large car | 2 | 17 | 19 | 89% | 67% | ||
Total | 27 | 24 | 51 | 47% | 20% | ||
E8 Hokuriku Expressway Kurosaki PA (Out-bound) |
Small car | 28 | 23 | 51 | 45% | 0% | Last year: 11/17 This year: unobserved |
Large car | 0 | 23 | 23 | 100% | 67% | ||
Total | 28 | 46 | 74 | 62% | 15% | ||
E8Hokuriku Expressway Yoneyama SA (Out-bound) |
Small car | 23 | 18 | 41 | 44% | 6% | Last year: 11/17 This year: unobserved |
Large car | 5 | 7 | 12 | 58% | 37% | ||
Total | 28 | 25 | 53 | 47% | 18% | ||
E18Joshin-Etsu Expressway Myoko SA (Out-bound) |
Small car | 29 | 6 | 35 | 17% | 23% | Last year: 11/15 This year: unobserved |
Large car | 3 | 12 | 15 | 80% | 81% | ||
Total | 32 | 18 | 50 | 36% | 46% | ||
total | Small car | 105 | 54 | 159 | 34% | 5% | |
Large car | 10 | 59 | 69 | 86% | 63% | ||
Total | 115 | 113 | 228 | 50% | 23% |
3 Request from NEXCO EAST Niigata branch office
- Please "install winter tires early before snowfall" and "carry a chain".
Last year, we observed the first snow on November 15 in the mountainous areas of the prefecture's Expressway and on November 17 in the plains, and we are carrying out snow removal work, so replace it with early winter tires. Please.
Also, in the case of heavy snow, you may be required to attach a chain even for winter tires, so please be sure to carry a chain with you. - Please drive slowly and safely when driving on snowy roads.
At the beginning of the snow season, driving sensations on snowy roads have not been restored, and even with winter tires, there is a tendency to cause traffic accidents.
Make sure to keep the distance between vehicles more than usual, and keep your speed down. Do not perform operations with "sudden" such as "sudden steering wheel," "accelerated acceleration," or "sudden braking" and drive slowly and safely. - Please "collect information diligently before and during your outing".
The Expressway winter changes suddenly. Even if the departure point is sunny, it may snow at the destination or passing point, so please wear winter tires and carry tire chains.
Also, please check the road information and weather information frequently before going out or in the service area.
"Drive Traffic (DraTra)" provides traffic congestion prediction, real-time traffic information, Expressway weather (snow road) prediction, and road surface condition (snow road live camera) information.
In NEXCO EAST, in order to use the winter highway safely, securely, comfortably and conveniently, at SA, PA, toll booth safety awareness activities and traffic safety campaign, "Dorapura""Dr. Mammoshi's Winter Expressway Course" We are proactively disseminating information about snowy roads, including the distribution of.
- "NEXCO EAST Niigata branch office twitter @ e_nexco_ niigata"
Information on driving and travel in Niigata Prefecture is being sent.
For traffic information and traffic closure information, please check the drive traffic "DraTra".
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.