[E18] Joshin-Etsu Expressway (between Shinanomachi IC and Joetsu JCT)
Notice of night traffic closure due to 4-lane construction (September to October 2018)
- Corporate Top
- Press Room
- Press Release Niigata office
- [E18] Joshin-Etsu Expressway (between Shinanomachi IC and Joetsu JCT) Notice of night traffic closure due to 4 lane construction (September to October 2018)
September 3, 2018
East Nippon Expressway Co., Ltd.
Niigata office
NEXCO EAST Niigata Regional Head Office (Chuo-ku, Niigata City) E18 Joshin-Etsu Expressway (upper and lower lines) between Shinanomachi Interchange (IC) and Joetsu Junction (JCT) will be closed at night due to 4-lane construction.
We apologize for the inconvenience to our customers, but we ask for your understanding and cooperation as it is a necessary suspension of traffic for the purpose of turning into four lanes.
Route | Joshin-Etsu Expressway | |
---|---|---|
section | [1] Shinanomachi IC-Joetsutakada IC (upper and lower lines) | [2] Nakago IC-Joetsu JCT (upper and lower lines) |
Implementation period | Tuesday, September 25, 2018-Friday, September 28, and Monday, October 1, 2018 [5 nights] (Preliminary day) October 2 (Tue) -October 5 (Fri) | From Thursday, October 18, 2018 to Friday, October 19, 2018 [2 night] (Preliminary day) October 22 (Mon) -October 23 (Tue) |
Time | From 20:00 to 6am the next morning | From 20:00 to 6am the next morning |
Construction content | Pavement work, facility equipment relocation / renewal work, lane switching work, etc. | |
Remarks | * Regulated sections, periods and times may be changed or canceled depending on the weather and construction progress. |
Closed section
[1] Joshin-Etsu Expressway Shinanomachi IC-Joetsutakada IC (upper and lower lines) No traffic at night
At the same time as this traffic closure, night traffic will be closed between the Hokuriku Expressway (Out-bound line) Naitani Tanihama IC ⇒ Joetsu JCT. For details on the Hokuriku Expressway Our homepage please look at.
[2] Joshin-Etsu Expressway Nakago IC ~ Joetsu JCT (up and down line) closed to traffic at night
Closing period
- Regarding connection fare adjustment due to suspension of traffic, see [ Attachment 1 [PDF: 85KB] ] Please check.
- NEXCO EAST provides services such as road traffic information, [ Attachment 2 [PDF: 73KB] ] Please check.
- Regarding the schedule of nighttime closing of nearby sections scheduled at the same time Attachment 3 [PDF: 87KB] ] Please check.
Outline of road closure work
Joshin-Etsu Expressway Shinanomachi IC-Nakago IC was opened in October 1997, and the Nakago IC-Joetsu JCT was opened in October 1999 with provisional 2-lane operation. After that, in response to the business license change in April 2012, construction of 4 lanes has started, but with this suspension of traffic, the temporary 2 lanes currently used as up and down lanes (hereinafter “opened lanes”) Work will be done to switch to the In-bound lane.
Specifically, we will carry out pavement work for already opened lanes, relocation and renewal of equipment, and work to switch some of the lanes that our customers pass from already opened lanes to newly constructed lanes.
Lane switching
From Tuesday, October 2 Joshin-Etsu Expressway Shinanomachi IC → Arai PA area (Out-bound line), From October 20 (Saturday) Joshin-Etsu Expressway Arai PA → Joetsu Takada IC area (Out-bound line), Some lanes change, respectively. We apologize for any inconvenience caused to passengers traveling on the section, but we ask for your continued efforts to drive safely.
Please note that the schedule may change depending on the weather and construction progress.
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.