Ban-Etsu Expressway, Nihonkai-Tohoku Expressway in Niigata Prefecture
Notice of night traffic closure due to wire rope installation work etc.
- Corporate Top
- Press Room
- Press Release Niigata office
- Notice of night traffic closure due to construction of Ban-Etsu Expressway and Nihonkai-Tohoku Expressway wire rope installation in Niigata Prefecture
The latest regulatory information isDraTraPlease see.
March 3, 2017
East Nippon Expressway Co., Ltd.
Niigata Regional Head Office
NEXCO EAST Niigata Regional Head Office (Chuo-ku, Niigata City) will open between the Ban-Etsu Expressway Tsugawa Interchange (IC) and Niigata Chuo Junction (JCT) from April 4 (Tuesday), and the Nihonkai-Tohoku Expressway Seiro Shibata IC-Arakawa Tonainai IC. Between the two temporary lanes, we will carry out night traffic closures due to construction work such as wire rope installation to prevent frontal collision accidents.
We apologize for the inconvenience to our customers, but we ask for your understanding and cooperation as it will block the traffic necessary for our customers to use the Expressway safely, safely and comfortably.
Ban-Etsu Expressway closed at night
Route | Ban-Etsu Expressway |
---|---|
section | Vertical line between Tsugawa IC and Niigata Central JCT |
Implementation period | April 4 (Tue)-April 23 (Sun) [20 nights including Saturdays, Sundays and holidays] Preliminary days: Monday, April 24 to Thursday, April 27 |
Time | 20:00 - 6:00 |
Construction content | Wire rope installation work, pavement repair work, tunnel equipment inspection |
Remarks |
|
※Detail is Attachment 1 [PDF: 385KB] Please refer to the.
Nihonkai-Tohoku Expressway closed at night
Route | Nihonkai-Tohoku Expressway |
---|---|
section | Up and down line between Seiro Shibata IC and Arakawa wombai IC |
Implementation period | Tuesday, April 4th to Thursday, April 27th [24 nights including Saturdays, Sundays, and holidays] Preliminary days: Monday, May 8 to Friday, May 12 |
Time | 20:00 - 6:00 |
Construction content | Wire rope installation work, pavement repair work |
Remarks | * Regulation period / time may be changed or canceled depending on the weather. |
※Detail is Attachment 2 [PDF: 572KB] Please refer to the.
Information such as road traffic information
" DraPla", a site full of useful information on Expressway across Japan
【address】
PC version
Mobile version (http://m.driveplaza.com/)
Smartphone version (http://www.driveplaza.com/smp/)
Expressway traffic information service "Drive Traffic (DraTra)"
It provides real-time road traffic information and traffic congestion prediction.
【address】
PC version
Mobile version (http://m.drivetraffic.jp/)
Smartphone version (http://www.drivetraffic.jp/smp/)
NEXCO EAST Customer Center
Operators are available 24 hours a day, 365 days a year.
【phone number】
0570-024-024 (ナビダイヤル)
03-5338-7524 (PHS・IP電話のお客様)
Highway telephone
You can get real-time traffic information (5 minutes update) 24 hours a day by phone.
【phone number】
025-286-1620 (新潟局) 携帯電話・PHSからは「#8162」
※全国どこからでも最寄りの情報センターに接続されます。
Japan Road Traffic Information Center
[Road Traffic Information Now! !! ]
【phone number】
全国共通ダイヤル 050-3369-6666 携帯短縮ダイヤル「#8011」
※全国どこからでも最寄りの情報センターに接続されます。
NEXCO EAST Niigata branch office twitter@e_nexco_niigata
Information on driving and traveling in Niigata Prefecture is being sent.
For traffic information and traffic closure information, please check the drive traffic "DraTra".
Reference material
- Attachment 1 Ban-Etsu Expressway Night Closure [PDF: 385KB]
- Attachment 2 The Nihonkai-Tohoku Expressway closed at night [PDF: 572KB]
- Flyer [PDF: 843KB]
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.