[E51] Notice of partial closure of Shisui PA on Higashi-Kanto Expressway In-bound

November 1st (Friday) and November 15th (Friday) from 10pm to 5am the following morning
- Gas stations (large vehicles only) due to construction work to add quick chargers
Some of the small car parking spaces and large car parking spaces are unavailable.

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E51] Notice of partial closure of Shisui PA on Higashi-Kanto Expressway In-bound

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 667KB]

October 18 2024
East Nippon Expressway Co., Ltd.
Chiba Management Office

NEXCO EAST Chiba Management Office (Chiba City, Chiba Prefecture) announces that the gas station (for large vehicles only) and some parking cells for small vehicles will be unavailable at the Shisui Parking Area (hereinafter "PA") of E51 Higashi-Kanto Expressway (hereinafter "East Kanto Expressway") (In-bound line) due to the construction of additional quick chargers. In addition, the parking lot for large vehicles will be unavailable due to the closure of the connecting road for large vehicles to the parking lot for small vehicles.
We apologize for any inconvenience this may cause and ask for your understanding and cooperation.

1. Closed location and date and time

  1. Closures:
    Higashi-Kanto Expressway, Shisui In-bound Area
  2. Image of closed area
    • Attached to each line E51 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    ① Implementation date:
    2024
    From 10pm to 5am the next morning
    Preparation day:
    November 2nd (Sat) - 3rd (Sun) 2024
    From 10pm to 5am the following day
    ② Implementation date:
    2024
    From 10pm to 5am the next morning
    Preparation day:
    November 16th (Sat) - 17th (Sun) 2024
    From 10pm to 5am the following day
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto) X (formerly Twitter) (external link)
  • In the event of bad weather, the event will be postponed to a spare date.
  • The decision to carry out construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the day of construction.

2. Usage restrictions

At the Higashi-Kanto Expressway In-bound Line Sakai PA, due to the construction of a quick charger near the entrance, the gas station (large vehicles only) and some of the parking spaces for small cars cannot be used. In addition, depending on the parking situation of the parking lot for small cars in the restricted area after 10 p.m., we may ask you to move the parked car. Thank you for your understanding.
At the same time, the connecting road to the parking lot for large vehicles will also be closed, so you will not be able to use the parking lot for large vehicles.
Please use the rest facilities in the vicinity according to your Expressway usage plan. (Please refer to the document [PDF:237KB]) )

Image of usage restrictions

3. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • iPhone / Android application "E-High Radi"
    It delivers real-time emergency information such as accidents and falling objects that occurred most recently in the direction of travel.
    https://www.driveplaza.com/traffic/e-highwayradio/
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on official X (formerly Twitter) and LINE accounts.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    “NEXCO EAST (Kanto Construction Regulations)” (@e_nexco_kanto_k) Decision to implement construction regulations
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.