[E51] Higashi-Kanto Expressway Out-bound Line Yatsu-Funabashi IC Exit Ramp
Notice of night closure

Monday, November 27th and Tuesday, November 28th from 10pm to 5am each day
~Carrying out road accident restoration work~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E51] Higashi-Kanto Expressway Out-bound Line Yatsu-Funabashi IC Exit Lamp Notice of Night Closure

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 712KB]

November 13, 2020
East Nippon Expressway Co., Ltd.
Chiba Management Office

At NEXCO EAST Chiba Management Office (Chiba City, Chiba Prefecture), Out-bound the E51 Higashi-Kanto Expressway (hereinafter referred to as "Higashi-Kanto Expressway") The exit ramp of the Yatsu Funabashi Interchange (hereinafter referred to as "IC") will be closed at night to carry out accident recovery work.
We apologize for any inconvenience this may cause, but we ask for your understanding and cooperation so that you have plenty of time when you go out.

1. 1. Ramp closure location and date and time

Image of the lamp closing point
  • Attached to each line E51 The indications such as indicate the route number (numbering) of Expressway.
number Road name Closed point period Attachment
E51
Higashi Kanto Expressway
Yatsu Funabashi IC
(Prefectural Route 15 exit ramp)
November 27th (Monday) 10pm to 5am the next morning
November 28th (Tuesday) 10pm to 2am the next morning
Material 1 [PDF: 462KB]
Yatsu Funabashi IC
(Exit ramp towards National Route 357)
Tuesday, November 28th 2:00-5:00 the next morning Material 2 [PDF: 400KB]
  • On the 28th, after ① work is completed and the closure is lifted, ② will be closed. Depending on the progress of the work, the closing times for ① and ② may change.
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto Construction Regulations) X (formerly Twitter) (external link)
  • Nighttime closures, etc. will be implemented in the order of "① Closed" ⇒ "① Closed ② Closed".
  • In stormy weather, it will be postponed to the spare day.
  • We will inform you about the construction implementation decision and the locations that will be closed on the day on X (formerly Twitter) etc. around 5:00 pm on the day.

2. Overview of construction etc.

At the exit ramp of the Yatsu-Funabashi IC on the Higashi-Kanto Expressway Out-bound Line, we will carry out accident recovery work on the top surface of the culvert box to prevent falling off and cleaning the drainage facility. The section where this work is carried out is a single lane, and since it cannot be carried out under normal lane regulations, it is necessary to close the ramp and work.
Therefore, in order to cause as little inconvenience to customers as possible, we will close the lamps on weeknights when there is little traffic and carry out construction work intensively and efficiently. This is necessary for safe and comfortable use of the Expressway, so we ask for your understanding and cooperation.

Photos of accident damage Image of the caption of the accident damage situation
Photo of image of flaking countermeasure work status Image of flaking countermeasure work status image caption

3. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs and leaflets will be posted at the surrounding toll booths and rest facilities.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • iPhone / Android application "E-High Radi"
    It delivers real-time emergency information such as accidents and falling objects that occurred most recently in the direction of travel.
    https://www.driveplaza.com/traffic/e-highwayradio/
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on official X (formerly Twitter) and LINE accounts.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    “NEXCO EAST (Kanto Construction Regulations)” (@e_nexco_kanto_k) Decision to implement construction regulations
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.