[C4] Ken-o Expressway "Ken-O Tsurugashima Interchange" elevation and access road (Tsurugashima City Route 1015) will open at 15:00 on Saturday, March 25, 2023.

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [C4] Ken-o Expressway "Ken-O Tsurugashima Interchange" Leveling and access road (Tsurugashima City Route 1015) will open at 15:00 on Saturday, March 25, 5th year of Reiwa Opens in minutes.

PDF version [PDF: 786KB]

February 20, 2020
Tsurugashima City
East Nippon Expressway Co., Ltd. Tokorozawa Management Office

Tsurugashima City, Saitama Prefecture and NEXCO EAST Tokorozawa Management Office (Tokorozawa City, Saitama Prefecture) have been developing C4 Ken-o Expressway (hereinafter "Ken-O Road") Ken-O Tsurugashima Interchange (hereinafter "IC") A three-dimensional and four-lane access road (Tsurugashima City Route 1015) will open at 15:00 on Saturday, March 25, 2023.
Please note that the entrance and exit of the IC will change due to the three-dimensionalization.

1. Opening date and time

March 25, 2020 (Sat) 15:00

2. Outline of Ken-O Tsurugashima IC Three-dimensional (entrance change)

  • maintenance point
    position:
    Ken-O Road Ken-O Tsurugashima IC ramp
    location:
    In Yanagito-cho, Tsurugashima City, Saitama Prefecture
  • maintenance extension
    1.5km (IC ramp)
  • Main body of maintenance business
    East Nippon Expressway Co., Ltd.

3. Outline of access road

  • Tsurugashima City Road Number
    City Road 1015
  • maintenance point
    position:
    Ken-O Road Ken-O Tsurugashima IC access road
    location:
    (Starting point) Tsurugashima City, Saitama Prefecture
    (End point) Tsurugashima City, Saitama Prefecture
  • maintenance extension
    1.8km
  • road width
    25m (4 lanes)
  • Main body of maintenance business
    Tsurugashima City, Saitama Prefecture

Four. Location map

Image of position map
Based on the map of the Geographical Survey Institute, East Japan Expressway, Ltd. processed

[Large view]

Image image of [Large view]

Five. Construction status

Image of construction status
Shooting time: Mid January 2023

6. About entrance/exit change to Ken-O Tsurugashima IC

① 1996 to December 2022
(provisional form)

Image of 1996-December 2022 (provisional form)

②December 2024 to March 2023
(Present tense after preceding change)

Image image from December 2024 to March 2023 (present tense after preceding change)

③From March 2023 (conceptual drawing)
Opened this time

From March 2023 (completion rendering) Image of the opening this time

Please note that the entrance and exit of the IC will change due to the three-dimensionalization.

7. 7. Expected maintenance effect

  1. Attracting companies and revitalizing the local economy
    The construction of the access road will improve the convenience of transportation, further enhancing the attractiveness of the area around the Ken-O Tsurugashima IC. It is expected that the local economy will be revitalized by attracting companies that make use of this development effect.
  2. Eliminate traffic congestion in surrounding areas and strengthen transportation networks
    The formation of a new traffic network through the development of access roads with four lanes will lead to the elimination of traffic congestion in the surrounding area, and the elevation of the Ken-O Tsurugashima IC will limit access Ken-O Road to the current National Route 407 direction. Instead, it will be possible from the direction of Route 927-2, so traffic will be smoother and the traffic network will be strengthened.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.