[E6] Notice of Closure of Joban Expressway Night Lights

~ We will repair damaged pavement ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E6] Notice of Closure of Joban Expressway Night Lights

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 496KB]

October 31, 2020
East Nippon Expressway Co., Ltd.
Mito Management Office

NEXCO EAST Mito Management Office (Mito City, Ibaraki Prefecture) will close the interchange (hereinafter "IC") ramp for pavement repair work on the E6 Joban Expressway (hereinafter "Joban Expressway").
We apologize for the inconvenience, but we ask for your understanding and cooperation so that you have plenty of time when you go out.

1. Lamp closure location and date and time

  1. Closed point
  2. section Road name Closed point period
    Section I E6 Joban Expressway Hitachi North IC
    (Out-bound entrance ramp)
    November 14th (Mon), 15th (Tue)
    Every night from 21:00 to 6:00 the next morning
    Section II Hitachi Central IC
    (Out-bound entrance ramp)
    November 28th (Mon) and 29th (Tue)
    Every night from 21:00 to 6:00 the next morning
    Image of closed area
    • Attached to each line E6 The indications such as indicate the route number (numbering) of Expressway.
  3. date and time
    Section I Hitachi Kita IC (Out-bound line entrance ramp)
    Implementation date:
    November 14th (Mon) and 15th (Tue), 2022
    Every day from 21:00 to 6:00 the next morning
    Preparation day:
    November 16th (Wednesday) to 18th (Friday), 2022
    Every day from 21:00 to 6:00 the next morning

    Section II Hitachi Chuo IC (Out-bound line entrance ramp)
    Implementation date:
    November 28 (Mon) and 29 (Tue), 2022
    Every day from 21:00 to 6:00 the next morning
    Preparation day:
    November 30 (Wednesday) to December 2 (Friday), 2022
    Every day from 21:00 to 6:00 the next morning
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto construction regulations) twitter (external link)
  • In stormy weather, it will be postponed to the spare day.
    Please refer to the attachment for the spare days and detours in case of postponement.
  • We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.

2. Detour

Please refer to [Attachment] [PDF: 223KB] for detours.
Due to the detour, the required time will be longer, so please leave with plenty of time.

3. Construction overview

At each IC on the Joban Expressway, road surface damage has occurred, so we will carry out pavement repair work. Since construction work cannot be carried out under normal lane restrictions, it is necessary to work with the ramp closed.
Therefore, in order to minimize inconvenience to customers, the ramp will be closed at night on weekdays when traffic is light, and construction will be carried out intensively and efficiently. We ask for your understanding and cooperation as this work is necessary for safe and comfortable use of the Expressway.

Photo of pavement damage situation Image of caption of pavement damage situation
Pavement repair work work status photo Image of caption of work status for pavement repair work

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    " NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    " NEXCO EAST (Kanto construction regulations)" (@e_nexco_kanto_k) Judgment regarding implementation of construction regulations
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.