[E4] Tohoku Expressway In-bound Line Urawa IC entrance ramp night closure notice
November 7th (Monday) from 20:00 to 5:00 the next morning
~We will update the road information board~
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- [E4] Tohoku Expressway In-bound Line Urawa IC entrance ramp night closure notice
The latest regulatory information isDraTraPlease see.
October 27, 2020
East Nippon Expressway Co., Ltd.
Kazo Management Office
At the NEXCO EAST Kazo Management Office (Kazo City, Saitama Prefecture), the road information board will be updated at the entrance lamp of the E4 Tohoku Expressway (hereinafter "Tohoku Expressway Expressway") In-bound line Urawa Interchange (hereinafter "IC"). carry out closure.
We apologize for the inconvenience, but we ask for your understanding and cooperation so that you have plenty of time when you go out.
1. 1. Closing location and date and time
- Closure location:
Tohoku Expressway In-bound Line Urawa IC entrance ramp (towards Tokyo) - Attached to each line E4 The indications such as indicate the route number (numbering) of Expressway.
- Date and timeImplementation date:Monday, November 7, 2020From 20:00 to 5am the next morningPreparation day:November 8th (Tue) and 9th (Wed), 2022From 20:00 to 5am the next morning
- In stormy weather, it will be postponed to the spare day.
- We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.
2. Detour
Please refer to the diagram below for detours. Due to the detour, the required time will be longer, so please leave with plenty of time.
When going to Gaikan Expressway Outer Loop (Misato direction)
Route 122 | National Route 298 | |||
Urawa Interchange | → | (connection) | → | Kawaguchi East IC |
(Time required: about 12 minutes (usually about 4 minutes), distance: about 6km) |
When going to Gaikan Expressway Inner Loop (towards Oizumi)
Route 122 | National Route 298 | |||
Urawa Interchange | → | Nishiaraijuku | → | Kawaguchi west IC |
(Time required: about 11 minutes (usually about 4 minutes), distance: about 8km) |
When heading to the Metropolitan Expressway (towards Tokyo)
Route 122 | Prefectural Road 239 | |||
Urawa Interchange | → | (connection) | → | Araijuku IC |
(Time required: about 14 minutes (usually about 4 minutes), distance: about 6km) |
3. Construction overview
Due to the deterioration of the road information board installed at the entrance ramp of Tohoku Expressway In-bound IC, we will carry out renewal work. The section where this work will be carried out is a single lane, and since construction cannot be carried out under normal lane restrictions, it is necessary to work with the ramp closed.
Therefore, in order to minimize inconvenience to customers, the ramp will be closed at night on weekdays when traffic is light, and construction will be carried out intensively and efficiently. We ask for your understanding and cooperation as this work is necessary for safe and comfortable use of the Expressway.
Four. How to obtain traffic information
(1) Guidance by distribution / posting
- Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
(2) Road traffic information that can be obtained before going out
- NEXCO東日本お客さまセンター(24時間オペレーターが対応)
ナビダイヤル:0570-024-024
または:03-5308-2424 - NEXCO EAST Expressway Traffic Information Site "DraTra"Real-time information[Mobile] http://m.drivetraffic.jp/Construction regulation information
- 日本道路交通情報センター(JARTIC) 道路交通情報
全国共通ダイヤル 050-3369-6666
(携帯電話短縮ダイヤル #8011)
※全国どこからでも最寄りの情報センターに接続します。
全国・関東甲信越情報 050-3369-6600
埼玉情報 050-3369-6611
【PC】https://www.jartic.or.jp/
(3) Road traffic information available while using the Expressway
- Road information board
- Highway radio (AM1620kHz)
The highway radio section is indicated by signs on the Expressway. - Highway Information Terminal
We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA. - VICS
You can get road traffic information with VICS-compatible car navigation and other on-board devices.
- Information is also distributed on the official Twitter account.
" NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
" NEXCO EAST (Kanto construction regulations)" (@e_nexco_kanto_k) Judgment regarding implementation of construction regulations
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.