【E4】Tohoku Expressway In-bound Line Kamikawachi Smart IC
Notice of night closure
September 5th (Monday) to 8th (Thursday) from 20:00 to 5:00 the next morning
~Renewal of ETC facilities~
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- [E4] Tohoku Expressway In-bound-bound Line Kamikawachi Smart IC Nighttime Closure Notice
The latest regulatory information isDraTraPlease see.
August 22, 2020
East Nippon Expressway Co., Ltd.
Nasu Management Office
At the NEXCO EAST Nasu Management Office (Nasu-machi, Nasu-gun, Tochigi Prefecture), at the E4 Tohoku Expressway (hereinafter "Tohoku Expressway Expressway") In-bound line Kamikawachi Smart Interchange (hereinafter "Smart IC"), in order to update the ETC equipment, nighttime carry out closure.
We apologize for the inconvenience, but we ask for your understanding and cooperation so that you have plenty of time when you go out.
1. 1. Closing location and date and time
- Closed location: Tohoku Expressway In-bound Line Kamikawachi Smart IC entrance/exit
- Attached to each line E4 The indications such as indicate the route number (numbering) of Expressway.
- Date and timeImplementation date:September 5th (Monday) to 8th (Thursday), 2022Every night from 20:00 to 5:00 the next morningPreparation day:September 9th (Friday) and 12th (Monday), 2022Every night from 20:00 to 5:00 the next morning
- In case of stormy weather, it will be postponed to the spare day.
- Construction will be decided on Twitter etc. at 17:00 on the evening of the day.
2. Detour
Please refer to the attached sheet [PDF: 344KB] for detour routes.
Detours will increase the time required, so please take time to go out.
3. Construction overview
We will update the ETC equipment at the entrance and exit of Kamikawachi Smart IC on the Tohoku Expressway In-bound line.
Since it is not possible to carry out construction under normal lane regulations, it is necessary to close the smart IC and carry out the work. Therefore, in order to minimize inconvenience to customers, the smart IC will be closed at night on weekdays when traffic is light, and construction will be carried out intensively and efficiently. We ask for your understanding and cooperation as this work is necessary for safe and comfortable use of the Expressway.
Four. How to obtain traffic information
(1) Guidance by distribution / posting
- Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
(2) Road traffic information that can be obtained before going out
- NEXCO東日本お客さまセンター(24時間オペレーターが対応)
ナビダイヤル:0570-024-024
またはTEL:03-5308-2424 - NEXCO EAST Expressway Traffic Information Site "DraTra"Real-time information[Mobile] http://m.drivetraffic.jp/Construction regulation information
- 日本道路交通情報センター(JARTIC) 道路交通情報
全国共通ダイヤル 050-3369-6666(携帯電話短縮ダイヤル #8011)
※全国どこからでも最寄りの情報センターに接続します。
全国・関東甲信越情報 050-3369-6600
栃木情報 050-3369-6609
【PC】https://www.jartic.or.jp/
(3) Road traffic information available while using the Expressway
- Road information board
- Highway radio (AM1620kHz)
The highway radio section is indicated by signs on the Expressway. - Highway Information Terminal
We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA. - VICS
You can get road traffic information with VICS-compatible car navigation and other on-board devices.
- Information is also distributed on the official Twitter account.
"NEXCO EAST (Kanto)" (@e_nexco_kanto) real-time traffic information
"NEXCO EAST (Kanto Construction Regulations)" (@e_nexco_kanto_k) Decision to implement construction regulations
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.