[E83] Daisan Daisan-Keihin Road Out-bound Line Hodogaya IC Entrance Lamp Notice of Night Closure

May 11th (Wednesday), 12th (Thursday), 18th (Wednesday), 19th (Thursday) from 23:00 to 5:00 the next morning
-We will repair damaged pavement-

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E83] Daisan Daisan-Keihin Road Out-bound Line Hodogaya IC Entrance Lamp Notice of Night Closure

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 470KB]

April 25, 4th year of Reiwa
East Nippon Expressway Co., Ltd.
Keihin Management Office

NEXCO EAST The Keihin Management Office (Yokohama City, Kanagawa Prefecture) Daisan-Keihin Road E83 (hereinafter referred to as "Daisan Keihin") Out-bound A ramp that flows into the E83 Yokohama-Shindo RoadOut-bound Line from Prefectural Road No. 13 at the Hodogaya Interchange (hereinafter referred to as "IC") and the capital Expressway In order to carry out pavement repair work for lamps flowing into the Yokohama-Shindo RoadOut-bound Line from the Mitsuzawa Line(hereinafter referred to as "Metropolitan Expressway"), we will close the lamp at night.
We apologize for any inconvenience this may cause, but we ask for your understanding and cooperation so that you have plenty of time when you go out.

1. 1. Closing location and date and time

  1. Closed place
    ① Daisan Keihin Hodogaya IC (flowing from Prefectural Road No. 13 to Yokohama-Shindo Road Out-bound Line) Entrance ramp
    Ramps flowing from the Metropolitan Expressway Mitsuzawa Line to the Yokohama-Shindo Road Out-bound Line
  2. Image of closed area
    • Attached to each line E83 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    May 11th (Wednesday), 12th (Thursday), 18th (Wednesday), 19th (Thursday), Reiwa
    Every day from 23:00 to 5:00 the next morning
    Preparation day:
    May 25th (Wednesday), 26th (Thursday), June 1st (Wednesday), 2nd (Thursday), 8th (Wednesday), 9th (Thursday)
    Every day from 23:00 to 5:00 the next morning
Image of closing date
Two-dimensional code image link to NEXCO EAST (Kanto construction regulations) twitter (external link)
  • In stormy weather, it will be postponed to the spare day.
  • We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.

2. Detour

Please refer to the figure below for detours.
As shown by the  pink arrow, flow out from the Mitsuzawa exit of the Metropolitan Expressway Mitsuzawa Line, turn right at the Mitsuzawa Park front intersection, follow Prefectural Road 13, turn left at the Mitsuzawa Park entrance intersection, pass National Road 1, and use the Yokohama-Shindo Road Hodogaya IC. please. If you detour as shown in the figure below, it will take about 4 minutes (usually about 2 minutes).
The detour will take longer, so please leave plenty of time.

Image of detour

3. Construction overview

At The Hodogaya IC on the No. 3 Keihin Out-bound Line, prefectural road No. 13 to Yokohama-Shindo RoadOut-bound We will carry out nighttime closures to repair the pavement of the inlet lamp flowing into the line and the lamp flowing into the Yokohama-Shindo RoadOut-bound line from the Metropolitan Expressway Mitsuzawa Line.
The section where this construction is carried out is one lane, and since construction is not possible with normal lane regulations when the construction is carried out, it is necessary to close the lamp and perform work. Therefore, in order not to cause inconvenience to customers as much as possible, we will close the lamp at night on weekdays when traffic is low, and carry out construction intensively and efficiently. It is necessary construction in order to use Expressway safely and comfortably, so please understand and cooperate.

Photo of pavement damage situation Image of caption of pavement damage situation
Pavement repair work work status photo Image of caption of work status for pavement repair work

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    " NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    " NEXCO EAST (Kanto construction regulations)" (@e_nexco_kanto_k) Judgment regarding implementation of construction regulations
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.