[E83] Daisan Daisan-Keihin Road Out-bound Line Hodogaya IC Okazawa Exit Lamp Notice of Night Closure

November 8th (Monday) to 11th (Thursday) from 20:00 to 5:00 the next morning
~ Repair work for damaged pavement ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E83] Daisan Daisan-Keihin Road Out-bound Line Hodogaya IC Okazawa Exit Lamp Notice of Night Closure

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 409KB]

October 25, 3rd year of Reiwa
East Nippon Expressway Co., Ltd.
Keihin Management Office

At NEXCO EAST Keihin Management Office (Yokohama City, Kanagawa Prefecture), pavement repair is carried out at the Okazawa exit ramp of the E83 Daisan Daisan-Keihin Road (hereinafter "Daisan Keihin") Out-bound line Hodogaya Interchange (hereinafter "IC"). It will be closed at night for construction work.
We apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation so that you will have time to spare when you go out.

1. 1. Closing location and date and time

  1. Closed place
    Daisan Keihin Out-bound Line Hodogaya IC Okazawa Exit Ramp
  2. Image of closed area
    • Attached to each line E83 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    November 8th (Monday) to 11th (Thursday), 3rd year of Reiwa
    Every night from 20:00 to 5:00 the next morning
    Preparation day:
    November 15th (Monday) to 18th (Thursday), 3rd year of Reiwa
    Every night from 20:00 to 5:00 the next morning
Image of closing date
Two-dimensional code image link to NEXCO EAST (Kanto construction regulations) twitter (external link)
  • In stormy weather, it will be postponed to the spare day.
  • We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.

2. Detour

Refer to the figure below for detours.

  1. When heading to Prefectural Road 13 / National Road 1
    Please use the Daisan Keihin Hazawa exit as shown by the  pink arrow. It will take about 7 minutes (usually about 3 minutes).
  2. When heading to the vicinity of Mitsuzawa Nishimachi 7-chome
    Please use the Daisan Keihin Hazawa exit as shown by the  blue arrow. Take Prefectural Road 13 toward Kannai / Sakuragicho and make a U-turn at the traffic light in front of Misawa Park. It will take about 9 minutes (usually about 3 minutes).

Detours will increase the time required, so please take time to go out.

Image of detour

3. Construction overview

The Okazawa exit ramp of the Daisan Keihin Hodogaya Out-bound will be closed at night for pavement repair work. The section where this work is to be carried out is one lane, and it is not possible to carry out the work under normal lane regulations, so it is necessary to close the lamp and carry out the work.
Therefore, in order to avoid inconvenience to customers as much as possible, we will close the lamps on weekday nights when there is little traffic, and carry out the construction intensively and efficiently.
This work is necessary to use the Expressway safely and comfortably, so we ask for your understanding and cooperation.

Image of pavement damage situation
Image of pavement repair work work situation

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    " NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    " NEXCO EAST (Kanto construction regulations)" (@e_nexco_kanto_k) Judgment regarding implementation of construction regulations
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.