[E83] Daisan Daisan-Keihin Road In-bound Line Kohoku IC Entrance Lamp Notice of Night Closure

June 7th (Monday) -June 9th (Wednesday) From 22:00 pm each day to 5:00 the next morning
~ Repair work for damaged pavement ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E83] Daisan Daisan-Keihin Road In-bound Line Kohoku IC Entrance Lamp Notice of Night Closure

The latest regulatory information isDraTraPlease see.

May 24, 3rd year of Reiwa
East Nippon Expressway Co., Ltd.
Keihin Management Office

NEXCO EAST Keihin Management Office (Yokohama City, Kanagawa Prefecture), pavement repair work is carried out at the entrance ramp of the E83 Daisan Daisan-Keihin Road (hereinafter "In-bound We will carry out a night closure to do this.
We apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation so that you will have time to spare when you go out.

1. 1. Closing location and date and time

(1) Closed place
Daisan Keihin In-bound Line Kohoku IC entrance (toward Tokyo) ramp
Image of closed area

  • Attached to each line E83 The indications such as indicate the route number (numbering) of Expressway.

(2) Date and time

Implementation date:
June 7th (Monday) to June 9th (Wednesday), 3rd year of Reiwa
Every day from 22:00 to 5:00 the next morning
Preparation day:
June 10th (Thursday), 14th (Monday) to 17th (Thursday), 3rd year of Reiwa
Every day from 22:00 to 5:00 the next morning
Image of closing date
Two-dimensional code image link to NEXCO EAST (Kanto construction regulations) twitter (external link)
  • In stormy weather, it will be postponed to the spare day.
  • We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.

2. Detour

  1. When heading toward Tokyo from the Daisan Keihin Kohoku IC
     Follow the orange arrow on the general road (Shin-Yokohama Motoishikawa Line) toward Tokyo and use the Tsuzuki IC. It will take about 8 minutes (usually about 2 minutes).
  2. Capital Expressway (hereinafter referred to as "Capital Highway") When heading toward Daisan Keihin Tokyo from the Yokohama Northwest Line / Yokohama North Line
     As shown by the blue arrow, flow out from the Yokohama Kohoku entrance of the Metropolitan Expressway, proceed on the Shin-Yokohama Motoishikawa Line toward Tokyo, and use the Tsuzuki IC. It will take about 10 minutes (usually about 4 minutes).
    The detour will take longer, so please leave plenty of time.
Image of detour

3. Construction overview

Since the pavement has been damaged at the entrance ramp of the Kohoku IC on the Daisan In-bound
The section where this work is to be carried out is one lane, and it is not possible to carry out the work under normal lane regulations, so it is necessary to close the lamp and carry out the work. Therefore, in order to avoid inconvenience to customers as much as possible, we will close the lamps on weekday nights when traffic is light and carry out construction intensively and efficiently. Expressway safely and comfortably, so we ask for your understanding and cooperation.

Image of pavement damage situation
Image of pavement repair work work situation

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    " NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    " NEXCO EAST (Kanto construction regulations)" (@e_nexco_kanto_k) Judgment regarding implementation of construction regulations
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.