[C3] Notice of closure of night ramp on Gaikan Expressway

~ Pavement repair work etc. ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [C3] Notice of closure of night ramp on Gaikan Expressway

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 1.4MB]

March 29, 3rd year of Reiwa
East Nippon Expressway Co., Ltd.
Misato Management Office

NEXCO EAST Misato Management Office (Misato City, Saitama Prefecture), an interchange (hereinafter "IC") will be used for pavement repair work and sign board replacement work on the C3 Gaikan Expressway) And the parking area (hereinafter referred to as "PA") will be closed.
We apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation so that you will have time to spare when you go out.

1. Lamp closure location and date and time

number Road name Closed point period Attachment
【1】 C3 Gaikan Expressway (1) Niikura PA
(Entrance lamp from the inner loop)
April 12th (Monday) and 13th (Tuesday)
Every day from 19:30 to 5:00 the next morning
Document-1
[PDF: 534KB]
(2) Wako Kita IC entrance
Entrance ramp to the inner loop (toward Oizumi)
April 12th (Monday) and 13th (Tuesday)
Every day from 20:00 to 5:00 the next morning
【2】 C3 Gaikan Expressway Kawaguchi Chuo IC
Entrance ramp to the outer loop (Misato
April 12 (Monday)
From 23:00 to 4:00 the next morning
Document-2
[PDF: 469KB]
Two-dimensional code image link to NEXCO EAST (Kanto construction regulations) twitter (external link)
  • Attached to each line C3 The indications such as indicate the route number (numbering) of Expressway.
  • In stormy weather, it will be postponed to the spare day.
    Please refer to the attachment for the spare days and detours in case of postponement.
  • We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.

2. Construction overview

For each IC and PA lamp on the outer ring road, we will repair the damaged pavement and replace the sign board to number the sign board.
The section where this work is to be carried out is one lane, and it is not possible to carry out the work under normal lane regulations, so it is necessary to close the lamp and carry out the work. Therefore, in order to avoid inconvenience to customers as much as possible, we will close the lamps on weekday nights when traffic is light and carry out construction intensively and efficiently. Expressway safely and comfortably, so we ask for your understanding and cooperation.

Image of pavement damage situation
Image image of image after pavement repair
Image of current status Image of the current state (caption) of the sign board
Image of sign board after replacement Image image of the image (caption) after replacement of the sign board

3. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    " NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    " NEXCO EAST (Kanto construction regulations)" (@e_nexco_kanto_k) Judgment regarding implementation of construction regulations
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.