"The 2nd Joshin-Etsu Expressway, Nagano Expressway for the holding of the glue surface measures and Technical Review Board"
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- "The 2nd Joshin-Etsu Expressway, Nagano Expressway for the holding of the glue surface measures and Technical Review Board"
January 24, 2020
East Nippon Expressway Co., Ltd.
Kanto Regional Head Office
E18 Joshin-Etsu Expressway between Usui Karuizawa IC and Saku IC is currently operating face-to-face (upper and lower lanes) using the In-bound line due to the occurrence of embankment deformation due to the effect of typhoon 19. .
4 Toward the traffic resumed in the lane, "according to the experts Joshin-Etsu Expressway, Nagano Expressway in Slope measures and Technical Review Board", and to consider the recovery method of the relevant section (Usui Karuizawa IC ~ Saku IC), the second The following technical study meeting will be held.
1 date and time
Monday, January 27, 2020 13:00 to 15:00
2 places
East Nippon Expressway Co., Ltd. Kanto Regional Head Office Meeting Room
3 members
Attachment [PDF: 49.6KB] As of
4 proceedings
- Field survey results
- Dynamic observation results
- Future monitoring system
- Future recovery policy, etc.
5 Other
- The study meeting will be held privately.
- After the study meeting is held, the results of the study will be announced.
![Image link (external link) to download page of Adobe Acrobat Reader](/assets/img/common/bnr_adobereader.png)
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.