[C3] Gaikan Expressway Oizumi IC entrance and [E17] Kan-Etsu Expressway Oizumi IC entrance Night closure notice
Tuesday, September 17, 18th (Wed), 24th (Tue), 25th (Wed),
Tuesday, October 29, Wednesday, October 30 Total 6 nights
Every day from 22:00 to 5am the next morning
-Constructing bridges on the outer ring road of Tokyo-
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- [C3] Gaikan Expressway Oizumi IC entrance and [E17] Kan-Etsu Expressway Oizumi IC entrance Night closure notice
The latest regulatory information isDraTraPlease see.
September 3, 2019
East Nippon Expressway Co., Ltd.
Tokyo Outer Ring Construction Office
NEXCO EAST in Tokyo outside the ring Construction Office (Nerima-ku, Tokyo), along with the construction of the Tokyo outside the nuclear ring road, E17 Kan-Etsu Expressway (hereinafter referred to as "Kan-Etsu Expressway in") Oizumi junction (hereinafter referred to as "JCT"), the Bridge erection work To do so, we will close the entrance of the C3 Gaikan Expressway (hereinafter "Outer Ring Road") Oizumi Interchange (hereinafter "IC") and the Kan-Etsu Expressway Oizumi IC entrance at night.
Due to this IC closure, the detours on general roads may be congested, so please check the road information before going out and use it with plenty of time.
We apologize for any inconvenience caused to our customers and residents along the road, but we ask for your understanding and cooperation.
1 Night closure / closed place, date and time, etc.
(1) Night closure
- Outer ring road (outer circumference) Oizumi IC entrance
- Kan-Etsu Expressway (Out-bound line) Oizumi IC entrance
(Attachment 1 [PDF: 198KB] reference)
(2) Date and time
- Scheduled September
Implementation date: September 17th (Tuesday), 18th (Wednesday), 24th (Tuesday), 25th (Wednesday) of the first 2019Every day from 22:00 to 5:00 the next morningPreliminary days: September 19th (Thursday), 20th (Friday), 26th (Thursday), 27th (Friday), 1st 2019Every day from 22:00 to 5:00 the next morning
- Scheduled October date
Implementation date: October 29th (Tuesday) and 30th (Wednesday), 1st 2019Every day from 22:00 to 5:00 the next morningPreliminary days: October 31st (Thursday), November 1st (Friday), 1st 2019Every day from 22:00 to 5:00 the next morning
- In case of stormy weather, it will be postponed to the spare day.
- We will inform you about the construction decision on Twitter etc. at 16:00 on the day.
(" NEXCO EAST (Kanto construction regulations)" ( @e_nexco_kanto_k ))
(3) Construction outline
With the construction of the Tokyo Outer Ring Road, Oizumi JCT will carry out bridge construction work (for details). Attachment 2 [PDF: 196KB] reference).
Details of Tokyo Outer Ring Project
2 Request for detour
During this construction, Attachment 1 [PDF: 198KB] Please use the detour and public transportation as described in.
3 How to obtain traffic information
(1) Guidance by distribution / posting
- Notice signs, posters, and leaflets will be posted at toll booths and rest facilities nearby.
- Post banners on overpasses on Expressway and pedestrian bridges on ordinary roads.
(2) Road traffic information that can be obtained before going out
- NEXCO東日本お客さまセンター(24時間オペレーターが対応)
ナビダイヤル:0570-024-024
またはTEL:03-5338-7524 - NEXCO EAST Expressway Traffic Information Site "DraTra "
[PC]
[Mobile] http://m.drivetraffic.jp/ - For the latest regulatory information, see DraTra "Please refer to the.
- 日本道路交通情報センター(JARTIC)の道路交通情報
全国共通ダイヤル 050-3369-6666(携帯短縮ダイヤル #8011)
※全国どこからでも最寄りの情報センターに接続します。
全国・関東甲信越情報 050-3369-6600
インターネット - ハイウェイテレホン(5分毎に更新される最新情報を24時間提供)
大泉局 03-3922-1620
所沢局 04-2946-1620
(3) Road traffic information available while using the Expressway
- Road information board
- Highway radio (AM1620kHz)
The highway radio section is indicated by signs on the Expressway. - Highway information terminal
We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA. - VICS
You can get road traffic information with VICS-compatible car navigation and other equipment.
* Information is also distributed on the following Twitter accounts.
・ "NEXCO EAST (Kanto)" (@e_nexco_kanto)
・ "NEXCO EAST (Kanto Construction Regulations)" (@e_nexco_kanto_k)
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.