Tokyo Outer Ring Road (Misato Minami IC-Takaya JCT) Open at 16:00 on Saturday, June 2, 2018 (2nd report)

~ The opening time has been decided ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Tokyo Outer Ring Road (Misato Minami IC-Takaya JCT) Opening at 16:00 on Saturday, June 2, 2018 (2nd report)

Thursday, April 26, 2018
Ministry of Land, Infrastructure, Transport and Tourism Kanto Regional Development Bureau Capital Highway Office
East Japan Expressway Co., Ltd. Kanto Regional Head Office

Opening of the outer ring road outside Tokyo

We would like to inform you that the opening time between Takaya JCT and Misato Minami IC on the Tokyo Outer Ring Road, which is jointly operated by the Kanto Regional Development Bureau of the Ministry of Land, Infrastructure, Transport and Tourism and East Nippon Expressway Co., Ltd. has been decided.

Opening day *
Saturday, June 2, 2018
Opening time
16:00

* The opening date will be announced in H30.3.23.

(About opening date)
(About tolls)

Outline of opening section

Open section
Gaikan Expressway: Misato Minami IC-Takaya JCT
National Route 298: National Route 6 to National Route 357
Extension
Gaikan Expressway: 15.5km
National Route 298: 11.4km
Opening IC / JCT
Misato Chuo IC, Matsudo IC, Ichikawa Kita IC, Ichikawa Chuo IC, Keiyo JCT, Ichikawa South IC, Takaya JCT
Number of lanes
Gaikan Expressway: 4 lanes, National Highway 298: 4 lanes

Tokyo Outer Ring Road (Misato Minami IC-Takaya JCT) Overview

Overview of this section

Open section
Gaikan Expressway: Misato South IC (Takano, Misato City, Saitama Prefecture) -Takaya JCT (Takaya, Ichikawa City, Chiba Prefecture)
National Route 298: National Route 6 (Kamiyagiri, Matsudo City, Chiba Prefecture) to National Route 357 (Takaya, Ichikawa City, Chiba Prefecture)
Opening date and time
June 2, 2018, 16:00
Extension
Gaikan Expressway: 15.5km
National Route 298: 11.4km
Opening IC / JCT
Misato Chuo IC, Matsudo IC, Ichikawa Kita IC, Ichikawa Chuo IC, Keiyo JCT, Ichikawa South IC, Takaya JCT
Number of lanes
Gaikan Expressway: 4 lanes, National Highway 298: 4 lanes
Image image of the outline of the opening section this time
Near Matsudo IC
Photos near Matsudo IC
Taken in April 2018
Near Keiyo JCT
Photos near Keiyo JCT
Taken in April 2018
Near Takaya JCT
Photos near Takaya JCT
Taken in April 2018

Smoothing traffic in the city center and improving logistics productivity

  • With this opening, approximately 60% of the outer ring has been completed, and four radiant roads (East Kanto Road Joban Expressway Tohoku Expressway Kan-Etsu Expressway) are connected.
  • The effect of the ring road is further expressed, such as being able to access the Kanto region (Saitama, Tochigi, Gunma, etc.) from the coastal area of Chiba without passing through the city center, contributing to the improvement of logistics productivity.
    (Travel time from East Kanto Expressway to Kan-Etsu Expressway, Tohoku Expressway, Joban Expressway is reduced from about 18 minutes to 26 minutes)
Image image of drastically shortened travel time from the Gulf area to the northern Kanto area

Voices from companies along the line

  • The Wangan area around the Takatani JCT is an intermediate point between Narita Airport and Haneda Airport, and is convenient because it has the Shutoko Wangan Line and the East Kanto Expressway, which makes the outer ring even more convenient.
  • Opening the outer ring will improve accessibility to Tohoku Expressway and Kan-Etsu Expressway, and improve location potential.
Source) March 2018 ESR (Logistics Facility Development Company) hearing survey

Alleviate traffic congestion in outer ring areas and improve the safety of community roads

  • The first 4-lane road (National Route 298) between Ichikawa and Matsudo opened. Traffic will switch from the surrounding roads to National Highway 298, contributing to the improvement of the local traffic environment.
  • In addition to alleviating traffic congestion in areas along the lines, it is expected to improve the safety of school routes by reducing the amount of detours flowing into residential roads.
Image image of relief of traffic congestion and improvement of safety of community roads along the outer ring

Promote wide-area tourism exchange in various parts of the Kanto region and the Gulf area

  • It is expected to promote wide-area tourism exchange by improving accessibility and increasing route options between the Gulf area where popular tourist facilities are scattered and tourist facilities in the Saitama area and northern Kanto area. (For example, it takes about 18 minutes to get from Tsukuba to Tokyo Disney Resort)
Image image of shortening the time required from each Kanto area to Tokyo Disney Resort
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.