Tokyo Outer Ring Road (Misato Minami IC-Takaya JCT) opens on Saturday, June 2 this year
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- Tokyo Outer Ring Road (Misato Minami IC-Takaya JCT) opens on Saturday, June 2 this year
Friday, March 23, 2018
Kanto Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Capital Highway Office
East Nippon Expressway Co., Ltd. Kanto Regional Head Office
On the Tokyo Outer Ring Road (Misato Minami IC-Takaya JCT), where the Ministry of Land, Infrastructure, Transport and Tourism and East Nippon Expressway Co., Ltd. are jointly operating,
- Gaikan Expressway: Misato Minami IC-Takaya JCT (extension 15.5km)
- National Road 298: National Road 6 to National Road 357 (extension 11.4km)
The effects expected from this opening are as follows.
- About 60% of the outer ring has been completed, and four radiant roads (East Kanto Expressway · Joban Expressway · Tohoku Expressway · Kan-Etsu Expressway) are connected.
- Travel time from Higashi Kanto Expressway to Kan-Etsu Expressway, Tohoku Expressway, Joban Expressway is reduced by about 18 to 26 minutes.
[Contributes to the improvement of logistics productivity by facilitating transportation in the city center]
- With the opening of National Highway No. 298, the area between Ichikawa and Matsudo will be connected for the first time by a four-lane road, alleviating traffic congestion in the areas along the road and contributing to improving the safety of residential roads.
[Alleviation of traffic congestion in areas along the outer ring and improvement of safety of community roads]
- The time required from Tsukuba to the large-scale customer attraction facility in the Gulf area is reduced by about 18 minutes.
[Promotion of wide-area tourism exchange]
- We will inform you again about the opening ceremony.
Tokyo Outer Ring Road (Misato Minami IC-Takaya JCT) Overview
Overview of this section
Open section
Gaikan Expressway: Misato South IC (Takano, Misato City, Saitama Prefecture) -Takaya JCT (Takaya, Ichikawa City, Chiba Prefecture)
National Route 298: National Route 6 (Kamiyagiri, Matsudo City, Chiba Prefecture) to National Route 357 (Takaya, Ichikawa City, Chiba Prefecture)
Extension
Gaikan Expressway: 15.5km
National Route 298: 11.4km
Opening IC / JCT
Misato Chuo IC, Matsudo IC, Ichikawa Kita IC, Ichikawa Chuo IC, Keiyo JCT, Ichikawa South IC, Takaya JCT
Number of lanes
Gaikan Expressway: 4 lanes, National Highway 298: 4 lanes
Smoothing traffic in the city center and improving logistics productivity
- With this opening, approximately 60% of the outer ring has been completed, and four radiant roads (East Kanto Road, Joban Expressway, Tohoku Expressway, Kan-Etsu Expressway) are connected.
- The effect of the ring road is further expressed, such as being able to access the Kanto region (Saitama, Tochigi, Gunma, etc.) from the coastal area of Chiba without passing through the city center, contributing to the improvement of logistics productivity.
(Travel time from East Kanto Expressway to Kan-Etsu Expressway, Tohoku Expressway, Joban Expressway is reduced from about 18 minutes to 26 minutes)
Voices from companies along the line
- The Wangan area around the Takatani JCT is an intermediate point between Narita Airport and Haneda Airport, and is convenient because it has the Shutoko Wangan Line and the East Kanto Expressway, which makes the outer ring even more convenient.
- Opening the outer ring will improve accessibility to Tohoku Expressway and Kan-Etsu Expressway, and improve location potential.
Source) March 2018 ESR (Logistics Facility Development Company) hearing survey
Alleviate traffic congestion in outer ring areas and improve the safety of community roads
- The first 4-lane road (National Route 298) between Ichikawa and Matsudo opened. Traffic will switch from the surrounding roads to National Highway 298, contributing to the improvement of the local traffic environment.
- In addition to alleviating traffic congestion in areas along the lines, it is expected to improve the safety of school routes by reducing the amount of detours flowing into residential roads.
Promote wide-area tourism exchange in various parts of the Kanto region and the Gulf area
- It is expected to promote wide-area tourism exchange by improving accessibility and increasing route options between the Gulf area where popular tourist facilities are scattered and tourist facilities in the Saitama area and northern Kanto area.
(For example, it takes about 18 minutes to get from Tsukuba to Tokyo Disney Resort)
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.