[E18] Joshin-Etsu Expressway Usui Karuizawa IC-Saku IC (Out-bound line)
Notice of day-night continuous lane regulation (3rd report)

Until April, 2019, excluding traffic congestion period
One-lane regulation will be implemented day and night, and tunnel repair work will be carried out.

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E18] Joshin-Etsu Expressway Usui Karuizawa IC-Saku IC (Out-bound line) Notice of day-night continuous lane regulation (3rd report)

December 15, 2017
East Nippon Expressway Co., Ltd.
Saku Management Office

Image of Renewal

NEXCO EAST Saku Management Office (Saku City, Nagano Prefecture), E18Joshinetsu Expressway (hereinafter "Joshinetsu way") We are implementing tunnel repair work from April, 2017 era on the down line between Usui Karuizawa Interchange (IC) and Saku IC. Thank you very much for your understanding and cooperation in construction.

As a third report, we will inform you of the regulatory schedule until the end of April 2018, including the traffic congestion period of year-end and new year. Also, during the period,Homepage for construction We have prepared, so please refer to it when using the Expressway.

This work is necessary to keep the Expressway network function healthy for a long period of time, so we ask for your understanding and cooperation.

1 Construction section Joshinetsu Expressway Usui Karuizawa IC-Saku IC (Out-bound line)

(1) Restricted section

Image image of construction section

2 Regulation period

Period covered: December 17 (Sun) 2017 - mid April 30 (day and night continuous lane regulation)

However, during the traffic congestion period ( December 23 (Sat), 2017 - January 8 (Mon · Holiday), 2018, February 10 (Sat) -​ February 12 (Mon · Holiday)) will not implement lane regulation. Furthermore, before and after the traffic congestion period, on Saturdays and Sundays traffic volume is more than usual, so it is expected that the flow of car will be worse, so please leave with time with time.

【The schedule of regulation from December 17 (Sun) in 2017 to mid April of 2018 is as follows. 】

Image of regulation period

*Regular implementation dates after mid-April will be announced in order.

3 Construction overview

Joshinetsu Expressway This is the repair work for the "Akari-san" tunnel between Usui Karuizawa IC and Saku IC (Out-bound line).

Since the lower part of the tunnel is damaged and the pavement surface is being damaged, full-scale repair work will be carried out before the traffic is affected.

Since it takes time to reinforce the damaged lower part of the tunnel body and it is necessary to construct each lane, we will carry out the construction under the day and night continuous lane regulation.

By reinforcing the lower part of the tunnel body, the structure of the tunnel is strengthened, and damage to the paved road surface is repaired to improve safety.

We ask for your understanding and cooperation so that our customers can use the Expressway safely.

Image image of construction outline

State of actual construction

Of the approximately 150m invert installation extension, about 50m has been completed.

Image image of actual construction

Content of regulation

Image of regulation contents

The maximum speed is 50km/h in the lane regulation section.
Also, since the width of the lane is narrow at the construction site,
When using it, please follow the signs on site and drive safely.

4 How to obtain traffic information

(1) Road traffic information available before going out

  • Homepage for the repair work of Mt.
    (Provision of information such as regulation period and construction outline)
  • NEXCO東日本お客さまセンター
    (24時間、365日、お客さまの声をお聞きしています)
    ナビダイヤル 0570-024-024(24時間オペレーターが対応)
    または 03-5338-7524
  • For the latest regulatory information, see "DraTra "Please refer to the.
  • NEXCO EAST Road Traffic Information Site "Dora Tora"
    (Provides traffic information for Expressway nationwide)
    [PC]
    [Mobile] http://m.drivetraffic.jp/
  • ハイウェイテレホン(5分毎に更新される最新情報を24時間提供)
    前橋局 027-252-1620
    長野局 026-278-1620
    (携帯電話・PHS短縮ダイヤル#8162
  • 日本道路交通情報センター(JARTIC)の道路交通情報
    全国共通ダイヤル 050-3369-6666(携帯短縮ダイヤル#8011
    ※全国どこからでも最寄りの情報センターに接続します。
    ※PHS、IP電話など一部の電話からはご利用できません。
    全国・関東甲信越情報 050-3369-6600
    ホームページ

(2) Road traffic information available during driving

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    Wide-area road information is provided in an easy-to-understand manner on the monitor screens installed in SA / PA.
  • * Twitter's official account "NEXCO EAST (Kanto)" (@e_nexco_kanto ) Also delivers information.
Image image of Expressway renewal project

Expressway Renewal project
Now, bring safety and security to the next generation.
NEXCO EAST, in order to deliver safety and security to everyone,
Expressway We will work on the update and repair business.

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.