[C4] At the Amihigashi IC toll gate on the Ken-o Expressway, we will start trial operation of opening the entrance ETC lane start control bar from Wednesday, November 1st.
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- [C4] At the Amihigashi IC toll gate on the Ken-o Expressway, we will start trial operation of opening the entrance ETC lane start control bar from Wednesday, November 1st.
October 26, 2017
East Nippon Expressway Co., Ltd.
Kanto Regional Head Office
NEXCO EAST Kanto Regional Head Office in (Saitama City), "the Ministry of Land, Infrastructure and Transport announced in 2015 October 14, Ken-O Road to start the experiment to open the ETC bar. - stress-free" smart tollgate Introducing "..." C4 Ken-o Expressway (hereinafter referred to as "Ken-O Road in Mobara north IC of"), but had been carried out a trial of the start control bar open operation of the toll booth entrance ETC lane, this year Ken-O Road Ami of At the East IC, we will try to open the start control bar on the ETC lane at the entrance to the toll gate.
1 Trial implementation location and implementation period
Location: Ken-O Road IC entrance ETC lane
Period: November 1, 2017 (Wednesday) 9:00 to December 20, 2017 (Wednesday) 9:00
*The exit ETC lane will operate as usual (opening and closing of the start control bar).
image
What to do if an error occurs in the entrance ETC lane
- If you can stop on the spot after checking the safety and paying sufficient attention to the following vehicles, please contact the staff using the intercom installed in the lane and follow the staff's instructions.
- If you pass through the toll gate as it is, proceed to the “general lane” or “ETC/general lane (mixed lane)” at the exit toll gate and tell the staff that an error occurred at the ETC lane at the entrance toll gate. Please offer.
Request for accident prevention
- Do not change lanes around the toll booth as it may cause an accident.
- On the ETC lane, slow down to less than 20 km/h, enter, and drive slowly.
2 Reference
Ministry of Land, Infrastructure, Transport and Tourism press release dated October 14, 2015
" Ken-O Road to start the experiment to open the ETC bar. - stress-free" introduction - of clever tollgate ' "
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.