Tohoku Expressway (Out-bound line) Between Sano Fujioka IC and Tochigi IC,
Kita-Kanto Expressway (to the east) Between Sananouma IC and Iwafune JCT
Notice of traffic closure at night

Until Wednesday, July 15 (midnight to 4:00)
~We will close at night to remove the gate type pillars~


  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Tohoku Expressway (Out-bound line) Sano Fujioka IC-Tochigi IC, Kita-Kanto Expressway (to the east) Sano Danuma IC-Iwafune JCT Night closure notice

July 1, 2015
East Nippon Expressway Co., Ltd.
Utsunomiya Management Office

NEXCO EAST Utsunomiya Management Office (Kanuma City, Tochigi Prefecture) is located at Tohoku Expressway (Tohoku Expressway) Iwafune Junction ( Due to the installation of additional lanes near JCT, Tohoku Expressway (Out-bound line) Sano Fujioka Interchange (IC)-Tochigi IC road widening work going. In order to remove the gate-shaped sign post in this construction, Tohoku Expressway Sano Fujioka IC-Tochigi IC and Kita-Kanto Expressway (North Kanto Expressway) Sananouma Closed at night between IC and Iwafune JCT.

At the same time, the Sano SA Smart IC Out-bound (Utsunomiya, Kitakanto Expressway, Fukushima) entrance in the closed section will also be closed.

We apologize for the inconvenience, and we appreciate your understanding and cooperation.

1 Night closed section and date and time

Tohoku Expressway (Out-bound line) Between Sano Fujioka IC and Tochigi IC (extension 17.7km)
Kita-Kanto Expressway (to the east) Sanodanuma IC-Iwafune JCT (extension 5.3km)
Sano SA smart IC Out-bound entrance closed
Wednesday, July 15, 2015, midnight to 4:00 (Spare days July 16 (Thursday) and July 17 (Friday))

Image image of nighttime closed section

Image image of the nighttime closing time

  • In case of stormy weather, it will be postponed to the same time zone from the next day.
  • In case of stormy weather, the decision will be made by 16:00 on the 14th day before the implementation.

2 Detour

(1) Tohoku Expressway Sano Fujioka IC ⇔ North Kanto Expressway Sano Danuma IC Detour

National highway No. 50 ⇔ (main) Sano Koga Line ⇔ (main) Sananonuma Line (about 11km)
( Attachment-2 [PDF: 142KB] reference)

(1) Tohoku Expressway Sano Fujioka IC ⇔ Kitano Kanto Expressway Sano Danuma IC Detour image

(2) Tohoku Expressway Sano Fujioka IC ⇒ Tohoku Expressway Tochigi IC Detour

National Route 50 ⇒ (main) Tochigi Fujioka Line ⇒ (prefecture) Tochigi Loop Line ⇒ (main) Tochigi Kasuo Line (about 20km)
( Attachment-3 [PDF:156KB] reference)

(2) Tohoku Expressway Sano Fujioka IC ⇒ Image image of Tohoku Expressway Tochigi IC detour

(3) Kita-Kanto Expressway Sano Danuma IC ⇒ Tohoku Expressway Tochigi IC Detour

(Main) Sanotanuma Line ⇒ National Route 293 ⇒ (Main) Tochigi Kasuo Line (about 21km)
( Attachment-4 [PDF: 147KB] reference)

(3) Kita-Kanto Expressway Sano Danuma IC ⇒ Tohoku Expressway Tochigi IC Detour image

3 Construction overview

Tohoku Expressway Iwafune JCT ~ Tochigi between the IC (Out-bound the line), in traffic congestion period such as Bon and tourist season, In-bound has traffic concentration congestion caused by speed reduction due to the slope. We are constructing an additional lane as part of this traffic congestion countermeasure. Construction started in January 2014 and is expected to take approximately two years by the end of FY27.

  1. Installation of additional lanes
    Tohoku Expressway (Out-bound) 62.6KP to 67.6KP (about 5.0km) Iwafune JCT A new lane will be added in front of the merge lane, but if there is no space to widen on the Out-bound side, the In-bound will be placed outside first. After widening, the Out-bound lane will be relocated to set up additional lanes.
  2. Construction content
    This work is to remove the existing gate-shaped sign posts (2 units) when the Out-bound line earthwork section is widened.
    In this construction, the existing gate-shaped sign post crosses three lanes, so it is necessary to close at night to ensure the safety of the customer at the time of removal.

In order to minimize the impact on our customers, we will carry out construction work intensively and efficiently by closing roads during the night hours on weekdays when traffic is light.

Image image of gate-shaped sign post to be removed this time

Gate-type sign post to be removed this time

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.