Tohoku Expressway Yaita IC (Out-bound line) Night exit closure (4 nights)
From 1st to 4th September from 21:00 to 5am the next morning
~We will carry out pavement repair work~
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- Tohoku Expressway Yaita IC (Out-bound line) Night exit closure (4 nights)
August 18, 2014
*Added on September 1, 2014
East Nippon Expressway Co., Ltd.
Nasu Management Office
(Added on September 1, 2014)
As for the Tohoku Expressway Yaita IC (Out-bound line) night exit closing scheduled today from 21:00 to 5:00 the following day (September 1), due to stormy weather, it will be the same time on Tuesday, September 2nd. Postponed to
We apologize for the inconvenience and ask for your understanding and cooperation.
NEXCO EAST Nasu management office at (Tochigi Prefecture Nasu-gun Nasu-machi), Tohoku Expressway of sheet pile Interchange (IC) Out-bound in order to carry out the pavement repair work at the line exit ramp, September 1 (Monday) from 4 days (Thursday) From 21:00 on each day to 5:00 on the next morning, the IC (Out-bound) night exit will be closed (4 nights).
We kindly ask for your understanding and cooperation in closing the night exit.
1 Night exit closing location and date and time
(1) Night exit closures
Outflow lamp from Yaita IC Out-bound line of Tohoku Expressway
(2) Date and time
From Monday, September 1 to Thursday, September 4, 2014 From 21:00 each day to 5:00 the next morning (4 nights)
Preliminary day: September 8th (Mon) and 9th (Tue) at the same time
- In stormy weather, it will be postponed to the spare day.
The decision to close the night exit will be made at 17:00 in the evening on the day of the implementation.
2 Detour
Please use National Route 293 and National Route 4 as a detour from Utsunomiya IC in the foreground. Attachment [PDF: 121KB]
Tohoku Expressway It usually takes about 15 minutes between Utsunomiya IC and Yaita IC, and about 60 minutes if you detour from Utsunomiya IC on Route 293 or Route 4. It will take about 45 minutes longer, so please take time to go out.
3 Construction overview
Tohoku Expressway Since the pavement of the sheet pile IC lamp is deteriorating, we will carry out pavement repair work.
Since this work involves "pavement removal and pavement" as a series of operations targeting narrow roads, it is necessary to close the outflow lamp.
Therefore, in order to minimize the impact on our customers, we will close the exits at night when traffic is light and carry out the work intensively and efficiently.
We ask for your understanding and cooperation so that our customers can use our products safely and comfortably.
4 How to obtain traffic information
(1) Information for exit closure
- Notice signs and posters will be posted on the surrounding IC and rest facilities.
- A banner will be posted on the overpass of Tohoku Expressway.
(2) Road traffic information that can be obtained before going out
- NEXCO東日本お客さまセンター
ナビダイヤル:0570-024-024 (24時間オペレーターが対応)
03-5338-7524 (PHS、IP電話のお客さま) - For the latest regulatory information, see DraTra "Please refer to the.
- NEXCO EAST Road Traffic Information Site "DraTra "
[PC] http://www.drivetraffic.jp/
[Mobile] http://m.drivetraffic.jp/ - 日本道路交通情報センター(JARTIC)の道路交通情報
全国共通ダイヤル 050-3369-6666(携帯短縮ダイヤル#8011)
※全国どこからでも最寄りの情報センターに接続します。
※PHS、IP電話など一部の電話からはご利用できません。
全国・関東甲信越情報 050-3369-6600
インターネット http://www.jartic.or.jp/ - ハイウェイテレホン(5分毎に更新される最新情報を24時間提供)
岩槻局:043-758-1620
宇都宮局:028-665-1620
(携帯電話・PHS短縮ダイヤル#8162)
(3) Road traffic information available while driving
- Road information board
- Highway radio (AM1620kHz)
The highway radio section is indicated by signs on the Expressway. - Highway Information Terminal
Wide-area road information is provided in an easy-to-understand manner on the monitor screens installed in SA / PA.
- Twitter's official account "NEXCO EAST(Kanto)" (@e_nexco_kanto ) Also delivers information.
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.