Ken-o Expressway Kawashima IC ~ Okegawa Kitamoto between the IC (outer loop) 50 hours of continuous closed to traffic announcements
From Monday, February 24 10:00 to 26th Wednesday 12:00
~We will change the connecting passage (lamp) to extend the Ken-O Road~
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- Ken-o Expressway Kawashima IC ~ Okegawa Kitamoto between the IC (outer loop) 50 hours of continuous closed to traffic announcements
January 27, 2014
East Nippon Expressway Co., Ltd.
Saitama Construction Office
NEXCO EAST in Saitama Construction Office (Saitama City), Ken-o Expressway (Ken-O Road for stretching construction of), Ken-O Road Kawashima IC ~ Okegawa Kitamoto between the IC in (outer loop), February 24 From 10:00 (Mon) to 12:00 (Wed) on 26th, we will be closed for 50 hours. In addition, the inner section of the same section can pass.
We ask for the understanding and cooperation of our customers regarding road closures.
1 closed section and date and time
(1) section, such as: Ken-O Road Kawashima IC ~ Okegawa Kitamoto between the IC (outer loop) (extended 5.7km)
(2) Closing date: February 24, 2014 (Monday) 10:00 to 26 (Wednesday) 12:00, 50 hours in a row
- If stormy weather is expected within the scheduled closing time of 50 hours, it will be postponed to the same time on the next day (Tuesday to Thursday) or the next day (Wednesday to Friday), the next week (Monday to Wednesday). No work will be done on Saturdays and Sundays.
- The decision to close the road will be made at 16:00 the evening before.
- 当日の実施判断など、お出かけ前の情報入手につきましては、NEXCO東日本 お客さまセンター(TEL:0570-024-024)、日本道路交通情報センター(TEL:050-3369-6600)などからご確認いただけます。
2 Detour
Please use prefectural roads 339 and 12 mainly as a detour. Attachment-1 [PDF: 281KB]
Ken-O Road travel time between Kawashima IC ~ Okegawa Kitamoto IC is usually about 8 minutes, but if you use the detour is expected to take about 15 minutes, depending on the use time of day and traffic conditions of the day It may take more time, so please take time to go out.
3 Construction overview
Currently under construction Ken-O Road towards the opening between the Okegawa Kitamoto IC ~ Shiraoka iris IC, do the work to switch the Okegawa Kitamoto IC of road warriors lamp. Attachment-2 [PDF:257KB]
In implementing this lamp switching work, we will close the traffic in February when traffic is relatively light to reduce the impact on our customers as much as possible, and carry out the lamp switching work intensively and efficiently.
After the switching work, the Okegawa Kitamoto IC will continue to work for the extension of the Ken-O Road.
In addition, we will also carry out road maintenance and repair work in the closed section.
4 How to obtain traffic information
(1) Closure posters, etc.
- Notice signs, posters, leaflets, etc. will be posted at toll booths and rest facilities nearby.
- A banner will be posted on the overpass of Kan-Etsu Expressway, Ken-O Road.
(2) Road traffic information that can be obtained before going out
- NEXCO東日本お客さまセンター
ナビダイヤル:0570-024-024(24時間オペレーターが対応)
TEL:03-5338-7524 (PHS、IP電話のお客さま) - NEXCO EAST Road Traffic Information Site "DraTra "
[PC] http://www.driveplaza.com/
[Mobile] http://m.driveplaza.com/ - For the latest regulatory information, see DraTra "Please refer to the.
- 日本道路交通情報センター(JARTIC)の道路交通情報
全国共通ダイヤル 050-3369-6666(携帯短縮ダイヤル♯8011)
全国・関東甲信越情報 050-3369-6600
ホームページ【PC】 http://www.jartic.or.jp/ - ハイウェイテレホン(5分毎に更新される最新情報を24時間提供)
所沢局:04-2946-1620
(3) Road traffic information available while driving
- Road information board
- Highway radio (AM1620kHz)
The highway radio section is indicated by signs on the Expressway. - Highway Information Terminal
Wide-area road information is provided in an easy-to-understand manner on the monitor screens installed in SA / PA.
- Twitter's official account "NEXCO EAST(Kanto)" (@e_nexco_kanto ) Also delivers information.
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.