Aiming at alleviating traffic congestion near the Kan-Etsu Expressway In-bound Line Kosaka SA

An additional lane will open between Kosaka SA and Tsurugashima IC (In-bound)

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Aiming at alleviating traffic congestion near the Kan-Etsu Expressway In-bound Line Kosaka SA

July 31, 2013
East Nippon Expressway Co., Ltd.
Kanto Regional Head Office

NEXCO EAST Kanto Regional Head Office (Taito-ku, Tokyo) is, Kan-Etsu Expressway (Kan-Etsu Expressway) In-bound but we have promoted the construction work to increase the lane aiming to alleviate traffic congestion in the vicinity of Kosaka service area of the line (SA), this time on August 9 We will inform you that an additional lane will open on Friday.

1 Date and time of opening

Friday, August 9, 2013 14:00
*The opening time may change depending on the weather conditions on the day.

2 Open places

"Additional lane" that extends about 1.3 km from a point about 1.5 km on the Tokyo side from Takasaka SA on the Kan-Etsu Expressway In-bound line
(From Sakado City, Saitama Prefecture, near the large door, near Sakado City, Saitama Prefecture, near Nakazato)

3 Business overview

Kan-Etsu Expressway In-bound Near Takasaka SA on the line, heavy traffic jams occur on the afternoons of holidays, especially during the Obon season, large holidays in spring and autumn, and during the holiday season. For the purpose of alleviating the traffic congestion, we are working together with the Sakado Nishi smart IC maintenance business to install additional lanes at locations with frequent traffic congestion near Kosaka SA.

4 Position map

Image of position map

5 Causes of traffic congestion and measures for improvement near Kosaka SA

Kan-Etsu Expressway In-bound in the vicinity of approximately 1.5km from Kosaka SA of lines to Tokyo side, loose Out-bound slope (gradient about 1.0%) from the loose In-bound slope sag portion that varies (gradient about 1.2%) (Out-bound from Slope In-bound recess approaches the slope In ), due to unconscious speed reduction, heavy traffic congestion occurs during heavy traffic. In order to alleviate this congestion, loose In-bound was established additional lane from just before the slope starts in about 1.3km section up to near the top of the hill.

Image image of the cause of congestion and improvement measures near the Takasaka SA

6 Improvement effects after countermeasures

By installing additional lanes at high traffic congestion areas near Takasaka SA, traffic capacity will increase, and we anticipate that congestion will be reduced by about 20% in the traffic area near Takasaka SA.

[Request to prevent/mitigate traffic congestion]
Congestion occurs from the passing lane (right lane). Please use the driving lane (left lane) as much as possible to prevent and alleviate traffic congestion.
Please be aware of unintentional slowdowns near Takasaka SA, and if you slow down, please use the additional lane that opens this time.

7 Sakado West Smart IC

The Sakado Nishi Smart IC, which was undertaking business at the same time, will open on August 25 (Sun) at 15:00. Regarding the opening of the IC, Here..


  • Twitter's official account "NEXCO EAST(Kanto)" (@e_nexco_kanto ) Also delivers information.