March 12, 2011
As of 05:30
East Nippon Expressway Co., Ltd.
Kanto Regional Head Office
By Tohoku region Pacific Ocean earthquake that occurred at around 46 pm on March 11, 2011 14 Expressway for the damage, NEXCO EAST Kanto Regional Head Office (Taito-ku, Tokyo, Regional Head Office length: Shinichi Ishikawa) is a confirmation of the disaster situation At the same time as we proceed, we are making every possible effort to restore the disaster area.
In addition, the response to the earthquake occurrence, Kanto Regional Head Office Kanto in the Regional Head Office has launched a disaster response headquarters.
For information on the Tohoku Regional Head Office Office, please visit our website.
[Use as an emergency transportation route]
In order to ensure the passage of emergency vehicles that carry the personnel and materials necessary for disaster emergency measures, the Expressway controlled by the Company may be designated as an emergency transportation route by the Public Safety Commission, and in this case, except for emergency designated vehicles You cannot pass.
1 Road closure (No change from 04:30)
(The table below shows the situation only within the jurisdiction of our Kanto Regional Head Office)
Road name | direction | section | Start of road closure | Suspension of traffic |
---|---|---|---|---|
Tohoku Expressway | Up and down | Kawaguchi JCT-Shirakawa | 3/11 14:51 | Ongoing |
Kan-Etsu Expressway | Up and down | Nerima-Tsukiyono | 3/11 14:51 | 3/12 0:00 |
Kan-Etsu Expressway | Up and down | Tsukiyono-water | 3/11 14:51 | 3/11 18:45 |
Kan-Etsu Expressway | Up and down | Tsukiyono-water | 3/12 04:02 | Ongoing |
Joban Expressway | Up and down | Misato JCT-Iwaki Nakoso | 3/11 14:51 | Ongoing |
Joshin-Etsu Expressway | Up and down | Fujioka JCT-Fujioka | 3/11 14:51 | 3/12 0:00 |
Joshin-Etsu Expressway | Up and down | Fujioka-Saku | 3/11 14:51 | 3/12 3:30 |
Joshin-Etsu Expressway | Up and down | Saku-Shinano Town | - | No road closures |
Nagano Road | Up and down | Toyoshina-Kosen JCT | - | No road closures |
North Kanto Expressway | East and West | Takasaki JCT-Kiryu Ota | 3/11 14:51 | 3/12 0:00 |
North Kanto Expressway | East and West | Sananouma-Iwafune JCT | 3/11 14:51 | Ongoing |
North Kanto Expressway | East and West | Tochigi Tsuga JCT-Mito Minami | 3/11 14:51 | Ongoing |
Higashi-Mito Road | East and West | Mito Minami ~ Hitachinaka | 3/11 14:51 | Ongoing |
Ken-O Road | Inside and outside | Akiruno-Okegawa Kitamoto | 3/11 14:51 | 3/12 0:00 |
Ken-O Road | Inside and outside | Tsukuba Central-Inashiki | 3/11 14:51 | Ongoing |
Ken-O Road | Inside and outside | Kisarazu East to Kisarazu JCT | 3/11 14:51 | Ongoing |
Tokyo outer ring road | Inside and outside | Oizumi-Misato Minami | 3/11 14:51 | Ongoing |
Keiyo Road | Up and down | Shinozaki-Ichikawa | 3/11 14:51 | 3/12 0:35 |
Keiyo Road /Tateyama Road | Up and down | Ichikawa-Futtsu Takeoka/Kisarazu Minami | 3/11 14:51 | Ongoing |
Futtsu-Tateyama Road | Up and down | Futtsu Takeoka-Tomiura | 3/11 14:51 | Ongoing |
Chiba-Togane Road | Up and down | Chiba Higashi JCT-Matsuo Yokoshiba | 3/11 14:51 | Ongoing |
East Kanto Expressway | Up and down | Gulf Ichikawa-Itako | 3/11 14:51 | Ongoing |
East Kanto Expressway | Up and down | Ibaraki Airport North-Ibaraki Town JCT | 3/11 14:51 | Ongoing |
New Airport Road | Up and down | Narita JCT-New Airport IC | 3/11 14:51 | Ongoing |
Tokyo Wan Aqua-Line Expressway | Up and down | Kawasaki Ukishima JCT-Kisarazu Kaneda | 3/11 14:51 | Ongoing |
Aqua line connecting road | Up and down | Kisarazu Kanada-Kisarazu JCT | 3/11 14:51 | Ongoing |
Daisan-Keihin Road | Up and down | Tamagawa-Hodogaya | 3/11 14:51 | 3/11 16:55 |
Yokohama-Shindo Road | Up and down | Hodogaya-end point | 3/11 14:51 | 3/11 16:55 |
Yokohama Yokosuka Road | Up and down | Shinhodogaya-Sahara | 3/11 14:51 | 3/11 16:55 |
Yokohama Yokosuka Road | Up and down | Sawara-Mabori coast | 3/11 14:51 | Ongoing |
Yokohama Yokosuka Road (Kanazawa branch line) | Up and down | Kamariya JCT-row of trees | 3/11 14:51 | 3/11 16:55 |
2 Road damage
The area most likely to be damaged in the Kanto Regional Head Office is the Joban Expressway Mito IC to Naka IC (In-bound).
Damaged situation of the Joban Expressway Mito IC-Naka IC (In-bound line) taken around 16:30
You can see the depression and waviness of the road surface for about 1.5 km
The above photo is posted on the website of NEXCO EAST
At some rest facilities, there are customers waiting, but there is no particular information about injuries.
Also, no customers are forced to wait on the main line.
(Some people are waiting on their own)
[Status of customers waiting at SA] (No change from 02:30)
Joban Expressway Tomobe SA (vertical), Joban Expressway Nakago SA (top), Joshinetsu road Kanra PA (below), the outer ring road NIIKURA PA, Dongguan canal Gulf Makuhari PA (vertical), Dongguan Road Shisui PA (top), Keiyo Road Makuhari PA (upper and lower), Keiyomichi Onitaka PA (upper and lower), Tateyamamichi Ichihara SA (upper and lower) About 150 in total