Notice of nighttime closure and IC closure on Expressway in Hokkaido
- Corporate Top
- Press Room
- Press Release Hokkaido office
- Notice of nighttime closure and IC closure on Expressway in Hokkaido
The latest regulatory information is DraTra Please see.
April 7, 2025
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office
NEXCO EAST Hokkaido Regional Head Office (Atsubetsu-ku, Sapporo City) will be Reiwa in May ~ July E5 Do-O Expressway, E5A Sasson Expressway, E5A Shiribeshi Expressway (SHIRIBESHI EXPRESSWAY), E38 Doto Expressway (Doto Expressway) and E62 Fukagawa-Rumoi Expressway (Fukagawa Rumoi Expressway) will be closed at night due to road surface repair work, tunnel inspection, four-lane construction work, etc. When you go out, please leave with plenty of time and use a detour.
We apologize for any inconvenience this may cause, but we ask for your understanding and cooperation in the construction and work necessary to use Expressway safely and comfortably.
1. 1. Closed section and date and time
Road name | section | Regulation content | Date and time | Details |
---|---|---|---|---|
Hokkaido road | Onuma Park Onuma Koen IC ~ Otoshibe IC | Road Closed (up and down lines) |
May 13th (Tuesday) - May 21st (Wednesday) Every day from 10pm to 5am the next morning |
Document-1 [PDF: 668KB] |
Ochibe Otoshibe IC -Yakumo Yakumo IC | Road Closed (up and down lines) |
May 22nd (Thursday) - June 2nd (Monday) Every day from 10pm to 5am the next morning |
||
Yakumo Yakumo IC ~ Kuni Nui Kunnui IC | Road Closed (up and down lines) |
June 3 (Tue) - June 24 (Tue) Every day from 10pm to 5am the next morning |
||
Kunui Kunnui IC ~ Oshamanbe Oshamanbe IC | Road Closed (up and down lines) |
June 25th (Wednesday) - July 3rd (Thursday) Every day from 10pm to 5am the next morning |
||
Sasson Expressway | Fushiko Fushiko IC | IC closure (Sapporo JCT direction, entrance) |
May 26 (Monday) 10pm to 5am the next morning |
Document-2 [PDF: 966KB] |
IC closed (for Otaru, exit) |
May 27 (Tuesday) 10pm to 5am the next morning |
|||
Sapporo West Sapporo Nishi IC | IC closure (Exit for Sapporo JCT) |
May 28th (Wednesday) - June 4th (Wednesday) Every day from 10pm to 5am the next morning |
||
Shinkawa Shinkawa IC | IC closed (for Otaru, exit) |
June 5 (Thursday) 10pm to 5am the next morning |
||
Sapporo North Sapporo Kita IC | IC closure (Sapporo JCT direction, entrance) |
June 6th (Friday) to June 9th (Monday) Every day from 10pm to 5am the next morning |
||
SHIRIBESHI EXPRESSWAY | Yoichi Yoichi IC -Otaru JCT | Road Closed (up and down lines) |
May 19th (Monday) - May 27th (Tuesday) Every day from 10pm to 5am the next morning |
資料-3【PDF:760KB】 |
DOTO EXPWY | Oiwakecho Oiwakecho IC to Yubari Yubari IC | Road Closed (up and down lines) |
May 8th (Thu) - May 16th (Fri) Every day from 10pm to 5am the next morning |
Document-4 [PDF: 763KB] |
Yubari Yubari IC ~ Shimukappu IC | Road Closed (up and down lines) |
May 7th (Wednesday) - May 16th (Friday) Every day from 10pm to 5am the next morning |
||
Shimukappu Shimukappu IC ~ Tokachi Shimizu and Chishimizu IC | Road Closed (up and down lines) |
May 23rd (Friday) - June 25th (Wednesday) Every day from 10pm to 5am the next morning |
||
Fukagawa Rumoi Expressway |
Fukagawa Fukagawa JCT to Fukagawa West Fukagawa IC | Road Closed (up and down lines) |
May 19th (Monday) - May 26th (Monday) Every day from 10pm to 5am the next morning |
Document-5 [PDF: 672KB] |
- None of these services are available on Saturdays, Sundays, or public holidays.
- Due to stormy weather, it may be postponed to the spare day. Please check the leaflet for spare days and detours.
2. Main construction contents
- Road surface repair work
...We will repair areas where cracks and unevenness in the pavement are evident. - Tunnel Inspection
...We will inspect the various facilities installed inside the tunnel. - Construction work to widen road to four lanes
...Road markings, temporary protective fences and paving work will be carried out in conjunction with lane changes.
Attachment-1 [PDF: 352KB]



3. Information during the construction period
Construction regulation information is provided in the following various media.
(1) Internet
- Road traffic information site "DraPla"
- Japan Road Traffic Information Center (JARTIC) "Road Traffic Information Now !!"
- Nationwide Expressway traffic information site "DraTra"
(2) SNS
- X (formerly Twitter) official account “NEXCO EAST (Hokkaido)” @e_nexco_kita
Information on Expressway within the jurisdiction of NEXCO EAST Hokkaido Regional Head Office -
Search for the official LINE account "NEXCO EAST" or "@e-nexco" and scan the QR code on the right
Provides information on Expressway within the jurisdiction of NEXCO EAST
(3) Information on distribution/postings
Post flyers and posters at nearby toll booths and rest facilities.
(4) Telephone
- NEXCO東日本お客さまセンター(24時間オペレーターが対応)
ナビダイヤル 0570-024-024
または 03-5308-2424 - 日本道路交通情報センター(JARTIC)道路交通情報
北海道地方高速情報 050-3369-6760
(携帯電話短縮ダイヤル #8011)
(5) Road traffic information available while using the Expressway
- Road information board
- Highway radio (AM1620kHz)
Signs indicate where the highway radio is broadcast. - VICS
You can get road traffic information with a VICS-compatible car navigation system or other onboard device.

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.