[E5] Notice of scheduled renewal work Do-O Expressway

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 876KB]

Expressway renewal project logo image image 1

July 19, 2024
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office

NEXCO EAST Hokkaido Regional Head Office (Atsubetsu-ku, Sapporo City) would like to inform you about Expressway renewal construction work to be carried out on the E5 Do-O Expressway from August to November 2024.
Lane restrictions will be in place as follows. Please be aware that the number of lanes will be reduced.
The renewal work is necessary to ensure that customers can use Expressway safely and securely. We will do our best to minimize the inconvenience to our customers, so we ask for your understanding and cooperation.

1. Location Map/Traffic Regulation Schedule

Image of location map and planned traffic regulation
number section period Congestion Forecast Details
Ebetsu Nishi IC - Iwamizawa IC
(up and down lines)
August 19th - November 10th None Attachment-1 [PDF: 308KB]
Shiraoi IC - Tomakomai West IC
(up and down lines)
August 20th - November 29th None Attachment 2 [PDF: 220KB]
  • Saturday, Sunday and public holidays are also regulated all day.
  • The traffic regulation period may change depending on the progress of construction.
  • Please check the latest traffic information before departure, as actual traffic conditions may differ from forecasts due to accidents, weather, etc.

2. Construction details

All of the construction we will inform you about this time is floor slab replacement work. In this work, the concrete floor slabs that have been damaged due to deterioration and the increase in the number of large vehicles will be replaced with new, more durable prestressed concrete slabs. In addition, high-performance floor slab waterproofing is applied to the waterproof layer to prevent deterioration of the floor slab.

Image of construction content

Construction image photograph

[Surface traffic regulation status] photo
[Restrictions on face-to-face traffic]
[Old floor slab removal status] photo
[Removal of old slabs]
[New floor slab installation status] photo
[New slab installation status]

3. Requests when using

  1. The construction section will have lane restrictions throughout the day. We do not anticipate traffic jams, but congestion is expected in the mornings, evenings, and on holidays, so please allow yourself plenty of time to get out.
  2. Since the lanes and road shoulders are narrow, please observe the speed limit when driving, secure a distance between vehicles, and be careful of rear-end collisions. In addition, lanes will change significantly before and after the restricted section, so please follow the local guidance signs.
  3. Vehicles for construction work may enter and leave the area around the construction site, so please be careful when traveling ahead.
  4. During the construction period, we will provide traffic congestion information using LED information boards, provide construction regulation information using road information boards and road signs, and call attention to driving safely. Please check this information before driving and drive safely.

Image of information provision image around the construction site

[LED information board] photo
[LED information board]
[Road information board] photo
[Road information board]
[Construction control material] photo
[Construction regulation materials]

Four. How to get traffic information

  • "DraPla", a site full of useful information on Expressway nationwide
    https://www.driveplaza.com/
  • Expressway traffic information service "Drive Traffic (DraTra)"
    Real-time information
    Construction regulation information
  • NEXCO東日本お客さまセンター
    24時間365日オペレーターが対応いたします。
    【電話番号】0570-024-024 または 03-5308-2424
  • 日本道路交通情報センター(JARTIC)の道路交通情報
    https://www.jartic.or.jp/
    【電話番号】050-3369-6760(北海道地方・高速情報)
  • LINE Official Account
    We inform you about the traffic closure situation in NEXCO EAST jurisdiction.
    [Search] Search by "NEXCO EAST"
    [ID] @e-nexco
    [Friend registration 2D code]
    Friend registration LINE two-dimensional code image link (external link)
  • X (formerly Twitter) official account
    "NEXCO EAST (Hokkaido)" (@e_nexco_kita) provides information on Hokkaido's Expressway.
  • Highway radio (AM1620kHz)
    The section on the broadcast is indicated by the signs on the Expressway.
  • Highway Information Terminal
    Wide-area road traffic information is notified on the monitor screen installed in SA / PA.
Expressway renewal project logo image image 2

Expressway renewal project
Now, safety and security to the next generation.
In order to deliver safety and security to everyone, NEXCO EAST will work on large-scale renewal and repair projects for Expressway.
Or search for "Fast Renewal".

The NEXCO EAST Group has positioned the period from 2021 to 2025 as "a period that contributes to the achievement of the SDGs and transforms into a new future society," and is making various efforts.
We believe that this "renewal work" initiative will contribute to the SDGs goals No. 8, 9, and 11 as business activities that lead to the development of safe, secure, and reliable infrastructure.

Image image of the SUSTAINABLE DEVELOPMENT GOALS logo and the 8th, 9th, and 11th logos of the SDGs target
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.